American Water Heater BCG3-80T150-6NOX, BCG3-100T250-6NOX warranty Sequence Of Operation Flow Chart

Models: BCG3-85T390-6NOX BCG3-100T250-6NOX Commercial Gas, Glass-Lined, Tank-Type Water Heater BCG3-80T150-6NOX

1 32
Download 32 pages 8.68 Kb
Page 28
Image 28
SEQUENCE OF OPERATION FLOW CHART

SEQUENCE OF OPERATION FLOW CHART

Description of this flow chart can be found in the “SEQUENCE OF OPERATION” section.

 

Ignition

 

 

Switch power on

Control Board

 

 

to unit.

opens Gas

 

 

 

Valve.

 

 

 

Ignition Control

 

 

 

Board shuts off

 

 

Thermostat calls

Silicon Nitride

 

 

for heat.

Ignitor after

 

 

 

3 seconds

 

 

Ignition Control

Ignition Control

 

 

Board performs

Board waits 3 more

 

 

diagnostic check on

seconds to

 

 

components

monitor Flame

 

 

 

Sensor.

 

 

Ignition Control

 

 

 

Board sends power

 

 

 

to Exhaust Inducer

 

 

Ignition Control

 

Did Main

 

 

NO

Board shuts off Gas

 

Burner Light?

 

Valve and allows the

 

 

 

Exhaust Inducer to

Exhaust Inducer

 

 

purge appliance for

 

 

20 seconds.

engages Prover

 

 

 

 

 

Switch

 

 

 

 

YES

 

 

Ignition Control

 

 

 

Board provides

Ignition Control

 

 

power to Silcon

Board monitors

 

 

Nitride Ignitor

units until T’Stat

 

 

 

is satisfied.

 

 

Silicon Nitride

 

 

 

Ignitor

 

 

 

warms up for

 

 

 

20 seconds

 

 

 

 

28

 

 

Page 28
Image 28
American Water Heater BCG3-80T150-6NOX, BCG3-100T250-6NOX, BCG3-85T390-6NOX warranty Sequence Of Operation Flow Chart