STEP 1. INSTALL PANEL SUPPORTS
•Always start at one end of the house.
•No overlap is needed where lengths meet.
•Nail on approximate 16" centers.
FOR PROJECTS I AND III, WHERE NEW OVERHANG WILL BE ON THE SAME ANGLE AS EXISTING OVERHANG OR RAFTERS
Install along wall of house by nailing through long leg into existing wooden overhang or rafters.
Fig. A
Project I | Project II |
FOR PROJECTS I AND III
Insert each panel into support and approximately even with outside edge of wooden front trim. Install each successive panel, pushing it up against the previous panel until it interlocks, before nailing into the bottom of the wooden front trim.
FOR PROJECTS II AND IV
Install the panel by sliding it into the tracked formed by the two panel supports. Install each successive panel, pushing it against the previous panel until it interlocks. Proceed until panel support against wall is filled. Install one additional length of panel support against the wall, as before. Proceed with installation of panels and panel supports.
FOR PROJECT I, WHERE YOU ARE CHANGING FROM AN INCLINED OVERHANG TO A HORIZONTAL OVERHANG
Mark point on wall level with bottom edge of wooden front trim |
|
at both corners (A). Strike a chalkline between the two points. |
|
Make 1” wide nailing flanges on long edge of panel |
|
supports by notching with metal snips and bending |
|
up. Fasten panel supports to wall with long side | A |
up and top horizontal edge even with | |
chalkline, nailing through flanges. | Fig. B |
| |
A |
|
Fig. C |
|
FOR PROJECTS II AND IV |
|
WHERE NEW OVERHANG WILL |
|
BE ON THE SAME ANGLE AS |
|
EXISTING OVERHANG RAFTERS |
|
Install along inside of wooden front trim |
|
Going Around Corners
If inside or outside corners are involved, make a mitre joint by butting two
STEP 3: INSTALL FRONT TRIM (Fascia or 1" Fascia Runner)
Note: If you are removing your existing gutter, mark the locations of the rafters so you can remount your gutter by fastening into the rafters, which is preferred over fastening to the wooden front trim.
by nailing through long leg or into existing |
overhang or rafters. |
Fig. D |
Project III | Project IV |
At one end of house, install only one length along the wall by nailing through long leg into existing wooden overhang or rafters (see Fig. A). Successive lengths will be installed along the wall after the overhang panels have been installed into the previous lengths.
FOR PROJECT II, WHERE YOU ARE CHANGING FROM
AN INCLINED OVERHANG TO A HORIZONTAL OVERHANG
Install along inside of wooden front trim (see Fig. D). Follow procedure illustrated in Fig. B to strike a chalkline on wall. Chalkline should be level with bottom leg of panel support. At one end of house, install only one length along the wall by forming 1” wide nailing flanges and nailing to wall with bottom horizontal edge even with chalkline. Successive lengths will be installed along the wall after the overhang panels have been installed into the previous lengths.
STEP 2. INSTALL OVERHANG PANELS (Soffit)
When turning a corner
ROOF GABLE BOARDS
Amerimax Fascia can also be used to cover Gable Boards. Follow, the same procedure as above, mitre cutting the panels at the peak.
CLEANING INSTRUCTIONS
Aluminum can be cleaned by using a mild soap and water solution. You should never use abrasive cleaners or pads.
2"
2"
Bend 90
FOR ALL PROJECTS: |
|
| Overhang |
Subtract ¼ inch (for clearance) |
|
| |
|
| Panel | |
from your measured overhang |
|
| |
|
|
| |
depth. Using this new |
|
|
|
dimension, cut the twelve foot |
|
|
|
lengths into individual panels, |
|
|
|
using your circular saw with |
|
| Interlocking |
fine tooth metal cutting blade. | Panel Support | Square | Nailing |
|
| Edge |
Always start at one end of the house. The first panel must be installed with
Important: Decide on the solid vs. vented pattern you wish to use. If you are covering an existing overhang you should cut a hole in the old overhang (to the approximate panel size) at each vented panel in order to achieve the desired air circulation.