Andrew ES76PK-1 installation instructions Installation Procedures, Install Brass Rod Holders

Models: ES76PK-1

1 52
Download 52 pages 13.28 Kb
Page 26
Image 26
1.3 Install Brass Rod Holders:

1.3 Install Brass Rod Holders:

Install brass rod holders in seam hole #11 on rib #2, 7, & 10 in Figures 19 and 20. Reflector seam screws must first be removed in these locations. Make sure the bottom of the rod holders are sitting flush on the reflector panels and they are pointed toward the theodolite assembly.

Attach the alignment stick to the rod holder in rib #2 with the knob assembly.

1.4 Install Target Screws:

Install target screws in all 16 ribs as shown in Figure 19 (reflector seam screws must first be removed in these locations). Be sure that target screws are fully seated on the rib surface, not the reflector surface. This is best done during assembly of Reflector/Backstructure.

 

 

 

 

 

 

 

(Rib)

 

 

 

 

 

 

 

 

 

 

 

(Panel Skin)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Refer to Figure 20

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Target Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Rib)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Theodolite Height Line

 

 

 

 

 

 

1/2”x2.0 Bolt, 9963.149

 

 

 

 

 

 

 

 

 

 

 

 

90o0’0”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Panel Skin)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Target Screw, 223717

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Support Assembly)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EL1=

88

o

55’ 23”

(88.9231

o),

Hole #27

Cambolt 1 (outboard)

EL2=

o 101

 

 

 

), Hole

#20

 

 

o

 

 

 

.3911

 

 

23’

28”

(101

 

 

 

 

 

 

 

 

 

Washer, 9997-57

Manual backgroundLockwasher, 9974-64

Nut, 9999-61

Cambolt 2 (inboard)

Alignment Stick, 223721A

Knob Assembly, 223745A

Rod Holder, 223718A

Rib/Reflector Panel

Washer, 9997-42

Manual backgroundNut, 9999-57

Figure 19

28

Installation Procedures

Page 26
Image 26
Andrew ES76PK-1 installation instructions Installation Procedures, Install Brass Rod Holders