APC AR3814 installation manual Installing Equipment

Models: AR3814

1 32
Download 32 pages 19.69 Kb
Page 21
Image 21
Installing Equipment

Installing Equipment

Warning: To prevent the enclosure from tipping over after equipment installation:

• Make sure you have secured the enclosure before installing equipment.

Load the heaviest equipment first toward the bottom of the enclosure to prevent the enclosure from becoming top-heavy.

Do not extend equipment on sliding rails until you have installed three or more pieces of similar-sized equipment or until you have installed the stabilizer plate or bolt-down brackets.

Do not extend more than one piece of equipment on sliding rails at a time.

Before getting started, make sure you have adjusted the vertical mounting rails as needed. To install rack-mount equipment in the NetShelter AV Enclosure:

1.Review the equipment manufacturer’s installation instructions.

2.Locate the top and bottom U-space on the vertical mounting rails. Every third hole on the mounting rails is numbered to indicate the middle of a U-space. A U-space consists of one of these numbered holes and one hole directly above and below it, as shown.

7Manual background

1 U Manual background 6Manual background

5Manual background

ns1595a

3.Install the equipment using the #10-32 screws (provided). See the manufacturer’s instructions provided with the equipment for additional details.

NetShelter 24 U AV Enclosure Installation Manual

17

Page 21
Image 21
APC AR3814 installation manual Installing Equipment