Contents
Introduction | 1 |
Safety Warnings and Cautions | 1 |
Unpacking the Enclosure | 2 |
Component Identification | 3 |
Helpful Steps for Reinstalling a Door | 5 |
Removing and Reinstalling the Roof | 6 |
Enclosure Installation | 7 |
Moving the Enclosure | . 7 |
Leveling the Enclosure | . 8 |
Reversing the Front Door | . 9 |
Securing the Enclosure | 12 |
Grounding the Enclosure | 13 |
Equipment Installation | 14 |
Adjusting the Vertical Mounting Rails | 14 |
Installing Equipment | 17 |
Cable Routing and Cable Management | 18 |
Vertical 0 U Accessory Channels | 18 |
Rear Door Cable Containment Bracket | 18 |
Accessories | 19 |
Specifications | 22 |
APC Limited Factory Warranty | 23 |
NetShelter 24 U AV Enclosure Installation Manual | i |