8.Dress the power cables so the ribbon cables will not be pinched, crushed, or other wise damaged when the cover is installed. If connecting Dry Contacts, it may be effective to install communication lines prior to power conductors.

9.Connect the unit to the service panel through the UL approved conduit with anti-short bushings as follows:

a.Strip about 3/8" (.95 cm) of the connecting wire insulation from each wire. Note: Terminal wire size range is #8 AWG to #1 AWG. The recommended wire size for phase, neutral, and ground is #6 AWG.

b.Twist the end of each connecting wire so it is uniform.

c.Slide the connecting wires through the hole in the side of the SPD.

d.Loosen the screws at the terminal lugs and insert the appropriate wire into the hole in each terminal lug. Tighten the phillips-head screw down onto the wire and torque to 18 inch-pounds. Note: The connecting wires should be kept as short as possible to enhance the performance of the SPD.

e.Connect a wire (in conduit) to the safety ground bus of the distribution panel, and to the ground connection of the SPD as shown in Figure 2, and as marked on the unit. Proper grounding is essential, use a green wire or yellow/green striped wire for the ground connection. Torque the phillips-head screws to 18 inch-pounds.

f.Connect a wire (in conduit) to the NEUTRAL bus of the panel and to the NEUTRAL connector of the SPD as marked on the unit. Use a white wire or mark with a white band for the neutral connection. Torque the phil- lips-head screws to 18 inch-pounds.

g.Connect a wire (in conduit) to each phase (HOT) feed on the LOAD side of the circuit breaker in the AC dis- tribution panel. Use a 30A to 40A (40A preferred) circuit breaker with the appropriate number of poles. Turn the circuit breaker OFF before making any connection. Refer to Figure 2 to identify the lug phase connections when making phase connections.

For answers to questions about installation, call APC’s Customer Service Department at: 800-800-4APC.

**Always Install the SPD on the LOAD side of the main disconnect**

After all connections have been made and no hazards exist, restore power to the AC distribution panel or breaker. If the SPD is installed and functioning properly, the green LED phase indicators on the front panel display will be lit and there will be no audible or visual alarms.

10.Use an AC voltmeter to check all voltages to ensure that the proper unit type has been installed for the service rating being protected.

11.Carefully install the front cover on the chassis. Ensure that the ribbon cables are dressed in a manner that they are not pinched or crushed when the cover is installed.

12.Tighten the captive screws that secure the cover to the chassis.

Circuit Breaker and Disconnect Switch

7KH￿30￿;￿6HULHV￿LV￿GHVLJQHG￿IRU￿FRQQHFWLRQ￿WR￿D￿￿￿$￿WR￿￿￿$￿FLUFXLW￿EUHDNHU￿￿￿￿$￿SUHIHUUHG￿￿￿￿7KH￿FLUFXLW￿EUHDNHU￿LV WKH￿LQWHQGHG￿GLVFRQQHFW￿VZLWFK￿DQG￿SURYLGHV￿VKRUW￿FLUFXLW￿SURWHFWLRQ￿WR￿WKH￿FRQQHFWLQJ￿FRQGXFWRUV￿￿7KH￿30￿;￿6HULHV KDV￿LQWHUQDO￿RYHUORDG￿SURWHFWLRQ￿HOHPHQWV￿

3DJH￿￿

Page 10
Image 10
APC PM3 user manual Circuit Breaker and Disconnect Switch

PM3 specifications

The APC PM3 (Power Manager 3) is a sophisticated power management solution designed for network and data center environments. This device is essential for ensuring reliability, efficiency, and effective management of power resources.

One of the main features of the APC PM3 is its ability to monitor and control power usage in real-time. This feature allows users to track power consumption and environmental conditions, providing critical data that can lead to more informed decisions regarding energy efficiency. The PM3 can measure input and output power loads, energy consumption, and other metrics which can be accessed via its user-friendly interface.

The technologies integrated within the APC PM3 enable advanced monitoring capabilities. It employs an innovative metering system that provides precise measurements of power usage. The built-in LCD display offers easy-to-read information, including voltage, current, power factor, and power consumption. This information enables users to quickly assess the performance of their power systems.

Communications play a vital role in the functionality of the APC PM3. It supports SNMP (Simple Network Management Protocol), allowing for seamless integration into existing network management systems. This facilitates remote monitoring and management, crucial for maintaining uptime in critical operations. Moreover, with the advanced notifications feature, users can receive alerts via email or SMS, which can help in taking proactive measures against potential power-related issues.

Another significant characteristic of the APC PM3 is its scalability. It is designed to be adaptable to various environments and can be integrated with other APC products, enhancing the overall power management strategy. This flexibility makes it suitable for small offices as well as large data centers.

In terms of safety and reliability, the APC PM3 is equipped with built-in surge protection to safeguard critical equipment from power anomalies. This feature is essential for maintaining the integrity of data and minimizing the risk of downtime due to unexpected power fluctuations.

Critical for today’s data-driven infrastructure, the APC PM3 empowers organizations to minimize energy costs and improve operational efficiency. By providing comprehensive insights into power management, the device stands as a cornerstone for smart energy usage, promoting sustainability while ensuring that power delivery remains uninterrupted. Overall, the APC PM3 is a reliable and advanced solution that adds significant value to power management strategies in any organization.