Specifications

Installation

Table 1:

Voltage Rating

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Peak Surge Current

 

 

 

 

Model

Voltage

 

(Rating per Phase)

 

Mounting

 

Protection

 

 

 

L-N

 

L-G

 

 

 

 

PMP1XR-B

120/240 V~

 

25 kA

 

25 kA

 

Side Nipple

 

Surge + Overload

 

 

 

 

 

 

 

 

 

Table 2:

General Specifications 1

 

 

 

System Voltage

 

 

 

120/240 V~

 

 

 

 

 

 

 

 

Maximum Continuous Operating Voltage

 

150 V~ L-N, 300 V~ L-L

 

(MCOV)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Short Circuit Current Rating 2

 

 

 

25 kA

 

 

 

Nominal Discharge Current (In)

 

10 kA (L1-N, L1-G, L2-N, L2-G)

Voltage Protection Rating (VPR)

 

700 V (L1-N, L1-G, L2-N), 800 V (L2-G)

 

 

 

 

Enclosure Rating and Housing Dimensions

 

Type 4X (see Figure 4)

 

 

 

 

 

 

 

Product Weight

 

 

 

1.8 lbs (0.9 kg)

 

 

 

 

 

 

Connection Method

 

 

 

Parallel, 12 AWG Solid Wire

 

 

 

 

 

 

 

 

Thermal Fusing

 

 

 

Yes

 

 

 

 

 

 

 

 

Operating Temperature

 

 

 

-40°F to +160°F (-40°C to +70°C)

 

 

 

 

 

 

 

 

Operating Frequency

 

 

 

50/60 Hz

 

 

 

 

 

 

 

 

 

 

 

Diagnostics

 

 

 

 

 

Green Status LED per line

 

 

 

 

 

 

 

 

Product Standards

 

 

 

UL 1449—3rd Edition, CSA C22.2 No. 8-

 

 

 

M1986, CSA C233.1-87 and CE

 

 

 

 

 

 

Product Rating

 

 

 

Type 1 Surge Protective Device (SPD)

1Contains no serviceable parts

2Suitable for use on a circuit capable of delivering not more than 25 kA rms symmetrical Am- peres.

1.Turn off all power supplying this equipment before working on or inside equipment.

2.For mounting, see Figure 1.

3.Confirm SPD is rated for your system by comparing voltage measurements to the Line Voltage (L-L, L-N) on the product label.

4.Confirm the black wires are connected to line wires, the white wire to the neutral wire and green wire to ground (see Figure 2). For the single- phase, 120/240 3-wire application, connect one of the SPD black wires to L1 and the other black wire to L2. For the single phase, 120 2-wire application, connect both SPD black wires to the same line.

5.Twist conductors 1/2 turn or more for every 12 inches of length.

6.Keep conductor length as short as possible with no sharp bends.

7.Do not loop or coil wires.

8.Use on solidly grounded systems only.