1
SPECIFICATIONS:
Enzyme/Manual Defrost Freezer PLUS Series
Inner Usable Int. Dim. Ext. Dim. Ship
Model Cu.Ft. Doors Doors/Drawers Shelves W" D" H" W" D" H" H.P Amps BTU/hr Ibs Ibs
MFP-0920 9 1 swing 5/2 6 fixed 16 16 50 22 24 64* 1/6 7 850 136 176
MFP-2020 20 1 swing 5/0 4 fixed 27 18 57 32 29 77* 1/4 5 770 315 355
MFP-2030 20 1 swing 5/0 4 fixed 27 18 57 32 29 77* 1/4 5 770 315 355
MFP-2920 29 1 swing 5/0 4 fixed 32 26 65 35 32 84* 1/3 5 2174 328 368
MCFP-1520 15 1 swing N/A 2 baskets 42 24 28 48 30 35* 1/4 5 770 191 231
MCFP-2020 20 1 swing N/A 2 baskets 56 24 28 62 30 35* 1/4 5 770 220 265
RECEIVING
A. LRP ships by carriers that we have used for many years and have selected for their good service,
but accidents in shipping occur regardless of how much care is taken. Therefore the following is
very important:
B. Inspect unit at once for any shipping damage, including concealed damage.
C. You should check for any shipping damage immediately, preferably before the carrier leaves
your receiving dock, as nearly all shipments are FOB ship point.
D. If there is any damage, note it on the carrier's receiving documents and notify the office of the
carrier immediately.
E. The responsibility of the shipper and the delivering carrier ends five days after goods are received.
It becomes the responsibility of YOU, the customer, to unpack the unit and check for concealed
damage caused during shipping. Immediate attention should be given to this.
F. Retain all packing materials if damage is found.
INSTALLATION AND STARTING INSTRUCTIONS
LOCATION – This unit requires a minimum of 4 inches of air flow in back and 1 to 2 inches on the sides
and top. Leveling legs are required in front only. Unit may have a slight tilt from front to back after
legs are installed. This is acceptable and is recommended on this unit.
POWER SOURCE – The supply circuit to this cabinet must conform to all National and Local Electrical
Codes. Consult the cabinet Serial-Data plate for voltage, cycle, phase, and ampere requirements
before making connection. VOLTAGE SHOULD NOT VARY MORE THAN 5% FROM SERIAL
PLATE RATINGS. A separate circuit is recommended to prevent possible loss of product due to
over-loading or failure of other equipment on the same circuit. PROTECT THE CIRCUIT WITH A 20
AMP DELAY-TYPE FUSE.
STARTING – There are no compressor shipping bolts to loosen or valves to open. All that is necessary
after the freezer has been properly leveled is to plug the service cord into an electrical outlet. Do not
use an extension cord. Be sure your freezer is properly grounded. Use the 3-prong plug provided
into a 3-prong grounded outlet. (Only this method complies with national electrical codes, local
codes and ordinances.) Unless the above grounding method is followed, you are not protected
against severe or lethal shock in the event of a short circuit of an electrical component or wiring of the
freezer. When starting this new appliance, allow the cabinet to operate a minimum of three hours or
until it has started cycling normally before placing product in the cabinet. The motor compressor may
start and stop several times when the unit is first started or after defrosting, especially if the weather
is very hot. This is only normal functioning of the motor overload protector. The motor compressor
will cycle normally as soon as the excess heat has been removed.