Now that the arbor is in place, measure 33” out from the side
panel post to locate the center position of the 4x4 post.
Align the center of arbor post with the center of the 4x4 post.
Dig a hole 24” deep and 10” wide; install a 5’ 4x4 pressure treated
post using concrete. The posts should be plumbed in two direc-
tions.
Slide the post sleeve over the post with the notched sides facing
the ground. Use shims to elevate the post sleeves 1/4” off the
ground.
Insert wing panel to ensure a good fit, adjust as needed before
concrete has fully set.

STEP 4: INSTALLING ARBOR IN PROPER LOCATION

STEP 5: SETTING THE POSTS/POST SLEEVES FOR GRAND ENTRY

The following steps only apply if you have purchased the complete Heritage Grand Entry package.
445.35.100 3 of 4 9/29/2006
Division of LWO Corp. / P.O. Box 17125 / 3841 North Columbia Boulevard / Portland, Oregon
503-286-5372 / fax 503-286-4092
Concrete footing
Arbor Side
Panel Post
Wing
Post
sleeve
4x4 Post
3/4” screws here Anchor butts into
bottom of rail
Rail
Side panel
rail
Temporary supports
Post
Concrete
Soil
Post
Anchors

Diagram 2

Diagram 1

The most common method of installation is to secure the arbor to
concrete footings using the four anchors provided. It may also be
possible to secure the arbor to an existing structure, such as a
fence post, if you would like it installed on concrete or decking. If
choosing this option see your local hardware dealer for the appli-
cable hardware.
Anchor and Concrete Installation
A. Move the arbor to its final location; this will require some
assistance. When you are satisfied with the location mark the
position of the posts, move the arbor aside and lay it carefully
on its side. Dig a hole at least 6” wide and 12” deep for each
post.
B. Attach the anchors to the posts using the 3/4” screws pro-
vided. See Diagram 1.
C. Carefully move the arbor back to its final position, support it
plumb and level over the holes with bricks, stones or blocks
of wood under the side panel rails. The post bottoms should
be close to the level of the ground surface. See Diagram 2.
D. Fill each hole with bagged concrete, mixed according to the
manufacture’s instructions. Concrete should come to within
1/4” of the bottom of the post but the post should not be in
concrete.