Operating Manual -
1. INTRODUCTION
Congratulations on your purchase of an Ashly
Aducking circuit allows a signal on either channel 1 or 2 to duck (attenuate) the signal on channels 3 through
8.Internally the
2. UNPACKING
As a part of our system of quality control, every Ashly product is carefully inspected before leaving the factory to ensure flawless appearance. After unpacking, please inspect for any physical damage. Save the ship- ping carton and all packing materials , as they were care- fully designed to reduce to minimum the possibility of transportation damage should the unit again require pack- ing and shipping. In the event that damage has occurred, immediately notify your dealer so that a written claim to cover the damages can be initiated.
The right to any claim against a public carrier can be forfeited if the carrier is not notified promptly and if the shipping carton and packing materials are not avail- able for inspection by the carrier. Save all packing mate- rials until the claim has been settled.
3. AC POWER REQUIREMENTS
The
125volts AC. Use only properly grounded AC recep- tacles. To reduce the risk of ground loop hum, use a cen- tral point for system AC power distribution. The AC line fuse is internal, and should only be changed by a quali- fied service technician.
4. SECURITY COVERS
For installations where it is desirable to protect the front panel controls from tampering or accidental misadjustment, use the Ashly security cover, which is available in both single and double rack space sizes. In- stallation is simple and does not require removal of the equipment from your rack. See your Ashly dealer for details.
3