KH0116 User Manual
CE-250R Installation
Installation is simply a matter of plugging in cables. Make sure that all the equipment to be connected up is powered Off, the perform the steps indicated below:
1.Plug the keyboard, monitor, and mouse cables for the remote console devices into their ports on the Console side of the
2.Plug either end of the Cat 5 cable into the
3.Plug the power adapter (supplied with the
4.Power up your KH0116 installation according to the steps given on page 11.
CE-250R Installation Diagram:
POWER
LINK
CPU
1
2
3
14