8Installation (for qualified installers only)
Travis Industries 100-01169_001 4050119
Installation Hints:
If converting to LP, convert the appliance prior to installation.
The blower is easiest to install prior to installation. Because the blower is located near the gas inlet
location, the gas inlet must be routing around the blower position.
Install the logs last - they are fragile.
When determining the location of the stove, locate the wall studs (for horizontal penetrations) and
ceiling trusses (for vertical penetrations). You may wish to adjust the stove position slightly to ensure
the vent does not intersect with a framing member.
Fumes and smoke from the paint curing and oil burning off the steel may occur the first time you start
this heater. This is normal. We recommend you open windows to vent the room.
Stove Clearances

Straight Installations Corner Installations

With this clearance, the vent is
centered 15-3/4" from the
wall.
5" Min.
With this clearance the
vent is centered 7-1/8"
from the back wall, 23-1/2"
from the side wall.
45°
5" Min.
10" Min.
Mobile Home Requirements
When the stove is installed in a mobile home, it must be bolted to the floor and the appliance
grounded (use the optional blower with a grounded circuit or other suitable grounding method -
current ANSI/NFPA 70).