Bakers Pride Oven FW-15L Installation, Instructions For Shipping Damage, Right-SidedSFW

Models: FW-15L SFW

1 20
Download 20 pages 14.84 Kb
Page 11
Image 11
Installation

Sandwich/Fry Warmer

Installation

 

 

Installation

Instructions For Shipping Damage

You are responsible for filing all freight claims with the delivering truck line. Inspect all cartons and crates for damage when they arrive. If there is damage noted to shipping crates or cartons, or, if a shortage is found, note this on the bill of lading (all copies) before signing.

If damage is detected when the equipment is uncrated, immediately call the delivering truck line and follow up the call with a written report indicating concealed damage to your equipment. Ask for an immediate inspection of your concealed damage item. Crating material MUST be retained to show the inspector from the truck line.

Electrical Information And Grounding

Electrocution, equipment failure or property damage could result if an unlicensed electrician performs the electrical installation. Ensure that a licensed electrician perform the electrical installation in accordance with local codes, or in the absence of local codes, with the National Electrical Code, ANSI NFPA 70-20XX.

This unit, when installed by an authorized BKI service agent, must be wired for use in accordance with all applicable local, state, and federal codes. For specific electrical requirements and connections refer to the wiring diagram attached to the unit or provided in the Service Manual.

Installation Instructions

Right-Sided SFW

1.Obtain a suitable countertop location and place the entire unit in position.

2.Measure, mark and cut a hole in the countertop for the Fry Warmer blower pan to fit in according to the following drawing.

9

Page 11
Image 11
Bakers Pride Oven FW-15L, SFW Installation, Instructions For Shipping Damage, Electrical Information And Grounding