Manuals
/
Bard
/
Household Appliance
/
Air Conditioner
Bard
MV4000 LOW voltage field wiring, Controller grounding, Controller power-up
Models:
MV4000
1
7
31
31
Download
31 pages
58.61 Kb
4
5
6
7
8
9
10
11
<
>
Parts list
Configuration
LOW voltage field wiring
Staging delay periods
Economizer failure alarm
Backup dc power connection
Temperature sensors
Page 7
Image 7
Page 6
Page 8
Page 7
Image 7
Page 6
Page 8
Contents
Installation Instructions & replacement parts list
Contents
Bard Bard Manufacturing Company, Inc
For more information, contact these publishers
Air Conditioning Contractors of America
American National Standards Institute
MV4000 Series Master Controller
Controller certifications
Bard Manufacturing Company, Inc Bryan, OH
Mounting the controller
SPECIFICATIONS/FEATURES for mv4000-B Controller
Temperature sensors
Temperature sensor logic
Economizer Fail Terminal Block
Located in the MV4000 panel box
Located on Main Controller Board
Gen Run/Econ Shutdown Terminal Blocka
Controller power-up
LOW voltage field wiring
Controller grounding
Fire suppression circuit
Staging delay periods
Advance Swap lead/Lag unit feature
Accelerate timer feature
General Programming Overview
Controller Programmable Features and Default Settings
Stage Compressor Units No Economizer
Humidity control option
Configuration
Air Conditioners with Electric Heat
Heating Sequence of OPERATIoN
For XP or Windows
CB4000 Communication Board
For Vista or Windows
Connect to network
Log Out Button
Backup dc power connection
Controller wiring
Security Locking feature
Generator run / economizer shutdown feature
HOOK-UP Diagram Selection Table Reference Shown
AC Unit
With Alarm Board & CB4000 Communication Board
MIS-3063
MIS-3062
This page intentionally left blank
MIS-3060
This page intentionally left blank
Compressor run alarm
Economizer failure alarm
Alarm wiring
ReFRIgerant pressure alarms
2nd stage cooling alarm
EmergencY venTIlatioN sequence
Manual 2100-571A
Manual 2100-571A
Programming instructions
27F/15C Lead
SEXP-638 a
Parts List