Bard WGEIFM-5C, WGSEIFM-5, WGEIFM-3C Installation Of Economizer Inset Side Section

Models: WGEIFM-5C WGEIFM-3C WGSEIFM-5

1 17
Download 17 pages 41.75 Kb
Page 5
Image 5
INSTALLATION OF ECONOMIZER

5.Install ventilator sheet metal assembly by inserting the ventilator into the unit – centering between the tubing on the left and the control panel on the right. Once the ventilator is fully inserted, slide the ventilator to align screw hole through the front of the condenser grille. (See Figure 2.)

IMPORTANT: Position front lip of ventilator on top of front grille and condenser partition. (See Figure 2 inset.) This is important to ensure proper drainage of any water entering damper assembly.

6.Open control panel to gain access to unit low voltage terminal block.

7.Install loose piece wire harness plug into filter tray & route wires into low volt box. (See Figure 3.) (Save back two {2} long red wires with push-on terminals.)

8.Plug wire plug from vent package installed in Steps #1 through #6 into plug installed in Step #7.

FIGURE 2

INSTALLATION OF ECONOMIZER

FIGURE 2 INSET

SIDE SECTION

Manual

2100-498B

Page

5 of 17

Page 5
Image 5
Bard WGEIFM-5C, WGSEIFM-5, WGEIFM-3C installation instructions Installation Of Economizer Inset Side Section