
INSTALL FLUE MOUNTING |
|
BRACKET |
|
1. Carefully center the mounting bracket di- | FLUE |
MOUNTING | |
rectly over the range hood location. | BRACKET |
2.Secure the bracket assembly to the ceiling using (2) 4.8x38mm mounting screws and drywall anchors. Make sure the bracket is pushed into the corner, tight against the wall and centered over the hood.
PREPARE THE HOOD
DUCTED CONFIGURATION ONLY
Note: On stainless steel hoods, carefully remove the plastic protective film from all exterior surfaces of the hood and decorative flues, prior to final installation.
1.Attach an adequate length of 6” round metal duct to the range hood duct connec- tor.
2.Duct tape all joints to make them secure and air tight.
3.Carefully place the lower decorative flue into the recessed area of the range hood top.
4.Carefully slide the upper decorative flue down inside the lower flue.
Note: On 8' ceilings the air vents on the upper flue are concealed by installing the flue with air vents down.
On 9' ceilings, air vents on the upper flue will be exposed after installation.
6” DIAMETER METAL DUCT
DUCT
CONNECTOR
UPPER
FLUE
VENTS
UPPER
EXPOSED FLUE
LOWER | LOWER | |
FLUE | ||
FLUE | ||
VENTS | ||
| ||
| CONCEALED |
- 8 -