PREPARE THE HOOD

Unpack hood and check contents. You should receive:

1 - Hood

1 - Decorative Flue Assembly

1 - Flue Mounting Bracket

1 - Parts Bag (B080810578) containing:

2 - Mounting Brackets

10 - Mounting Screws (4,8 x 38mm Pan Head)

4 - Mounting Screws (3,9 x 9,5mm Pan Head)

4 - Mounting Screws (3,9 x 9,5mm Pan Head - Black) 10 - Drywall Anchors

1 - Installation Instructions

1 - Warranty Card

FLUE MOUNTING

BRACKETMOUNTING

BRACKETS

DECORATIVE

4 MOUNTING

4 MOUNTING

FLUE

SCREWS (3,9x9,5mm

SCREWS (3,9x9,5mm

 

Pan Head)

Pan Head - Black)

10 MOUNTING SCREWS

10 DRYWALL

ANCHORS

(4,8 x 38mm Pan Head)

 

- 5 -

Page 5
Image 5
Best K42 manual Prepare the Hood