Installation
Use the
Find an empty rack space on a relay rack or communications cabinet.
Without using the cable management bar:
1.Install the panel with the supplied
2.Install the
3.Secure the ground wire to a relay rack or cabinet.
Using the cable management bar:
1.Remove the two cuphead screws from the rear of the patch panel.
2.Position the cable management bar on the patch panel and reinstall the two cuphead screws.
3.Install a patch cable in one of the panel’s rear ports. Unscrew the corresponding silver clip behind the installed port and position the patch cable under the silver bracket. Tighten the screw.
4.For a
5.Secure the ground wire to a relay rack or cabinet.
Installation is complete.
© Copyright 2013. Black Box Corporation. All rights reserved. Printed in U.S.A. Black Box® and the Double Diamond logo are registered trademarks of BB Technologies, Inc. Any
FREE, live, 24/7 Tech Support is just 30 seconds away.