Industrial Grade
Industrial Grade | Industrial Grade | |
|
|
|
What’s Included
Your package should include the following items. If anything is missing or damaged, contact Black Box Technical Support at
•(1) Industrial Grade
•(1) USB cable
•(2)
•(1) DIN rail adapter and (3) mounting screws
•This quick start guide
NOTE: A power supply is not included.
Overview
Figure 1 shows the front view of the hub. Figure 2 shows the side view.
To USB host | LED | Downstream |
| indicators | ports |
Figure 1. Front view.
Detachable | Power plug | |
| ||
terminal block |
|
|
Figure 2. Side view
Installation Steps
Step 1: Mounting
DIN rail mounting: Attach the DIN rail bracket with the flat surface of the bracket facing the back of the hub, as shown in Figure 3.
DIN rail bracket
Figure 3. DIN rail bracket attached to hub.
Panel mounting: Attach the
brackets
Figure 4.
Step 2: Connect the Power Supply
ICI200A: The
it provides a maximum of 100 mA to each of the downstream ports.
ICI202A: Unike the
When powered, the ICI200A and ICI202A will provide 500 mA to each downstream port. They require 10 to 30 VDC of external power and will consume a maximum of 16 W.
NOTE: The ICI202A adds 4-kV isolation.
Step 3: Grounding
We recommend that you ground the chassis. Connect a grounding wire from the green ground lug to a good source of earth ground.
Figure 5. Grounding the chassis.
Step 4: LED Status
Figure 6 shows the LEDs on the ICI200A and ICI202A. Table 1 describes their functions.
Figure 6. Left: ICI200A; right: ICI202A.
Page 2 | Page 3 | Page 4 |