2
Assembly
IMPORTANT: The support brackets must be assembled to the
�
��������������������������
����������������������������
��������������������������
�
��
outside of the handle- bar assembly.
�
�
IMPORTANT: Before starting the engine, the wheels must be placed in the WHEEL DRIVE position (pins through wheel hubs and wheel shaft). This procedure is described in Wheel Drive Pins on page 10.
�
�
�
Fig. 2.2: Attach handlebar.
3.There are three height adjustment holes in the two handlebar support brackets (E and F, Fig.
(D)and
4.Tighten all handlebar mounting hardware securely.
STEP 3: MOVE TILLER OFF CRATE
To roll the tiller off the shipping platform, put the wheels in freewheel, as follows:
1.Place a sturdy block under the transmission to raise one wheel about 1” off the ground.
2.Remove the Klik Pin (J, Fig.
(K) and wheel shaft (L).
�
�
�
Fig. 2.3: Wheel in FREEWHEEL position (wheel drive pin through wheel shaft only).
3.Slide the wheel fully inward on the wheel shaft (N, Fig.
4.Use the handlebar to roll the tiller to a flat area.
6