Bosch Appliances 19/24CBI, 14/19 Operation Of Controls, Operate To Fails Appliance, Notes General

Models: 40800 19/24CBI 14/19

1 4
Download 4 pages 44.89 Kb
Page 3
Image 3
19/24CBi

5

.open door the with allowed be should 600mm of clearance A .door a .g.e panel removable a be to is front the at clearance The *

 

200

200

200

Below

 

 

180

180

180

Turret) (Flue Above

 

 

 

 

 

 

 

 

30

30

30

Flue) Only (Rear Above

 

 

 

 

 

 

 

 

340

340

340

Front* In

 

 

 

 

 

 

 

 

105

105

105

side hand-Right

 

 

 

 

 

 

 

 

105

105

105

side hand-Left

 

 

 

 

 

 

 

 

19/24CBi

14/19CBi

9/14CBi

 

 

 

 

.required are clearances minimum following The

.compartment of type this in stored be not must objects Flammable

 

.appliance the to closer .etc shelves cupboard of addition the by

restricted be not must space This .servicing and safety for appliance

 

the around space adequate provided have will installer Your

 

 

 

Ventilation No With Compartment

 

 

 

 

 

 

200

200

200

Below

 

 

180

180

180

Turret) (Flue Above

 

 

30

30

30

Flue) Only (Rear Above

 

 

600

600

600

Front In

 

 

5

5

5

side hand-Right

 

 

5

5

5

side hand-Left

 

 

19/24CBi

14/19CBi

9/14CBi

 

 

 

 

.required are clearances minimum following

The .appliance the to closer .etc shelves cupboard of addition the by

restricted be not must space This .servicing and safety for appliance

 

the around space adequate provided have will installer Your

 

 

 

Ventilation With Compartment

 

 

 

 

CLEARANCES

 

 

 

 

.corrected

 

system the and contacted be should engineer service a radiator, any

from required be venting excessive or system the in found be leaks water

Should .appliance the of operation satisfactory and safe for replenished

be must this and system the in water of quantity the reduce will venting

repeated system sealed a On .operation the out carry to how you shows

 

installer your sure Make .radiator each of top the at screw venting

the through air releasing by vented be should it radiator, the of base

the than temperature lower a at be radiator a of area upper the Should

 

.rate even an at heated being are radiators all that check system,

 

heating central the of operation of hours few first the During

 

 

SYSTEM HEATING CENTRAL

 

.maintained are boiler the to connected systems water hot and

heating the of operation efficient and satisfactory the that ensure

 

to take should you actions any of you advise will installer Your

 

 

NOTES GENERAL

OPERATION OF

CONTROLS

BOILER HEATING TEMPERATURE

CONTROL

The position of this control will determine the temperature of the water delivered from the appliance between the start of the dial as indicated thus ' 14/19CBi ' and the fully on position i.e. when the control is turned fully clockwise. When the knob is turned fully anti-clockwise to the ‘O’ position the appliance is off.

BOILER RESET BUTTON

If the lockout light is on or flashing, turn the temperature control fully anticlockwise to the 'O' position and back on again. If the appliance still fails to operate then contact Worcester Bosch or your installer.

12

.accepted be not will party third any by appliance your on out carried work repair and/or attendance for Invoices NOTE:

.Worcester by supplied not equipment with or system, plumbing/heating your of parts other with is breakdown of cause The

or note), (see appliance the with fault no finds Engineer Service Field Our

or months, 12 over for installed been has appliance The where: made be will charge out-call A

.months 12 past the within installed been has appliance the and found is fault appliance An

.installation on correctly commissioned was appliance The

providing: labour, and/or parts for made be will charge no months, 12 last the within installed been has appliance your and engineer an from visit a request you If

.trained factory are engineers service field our of All CHARGES OUT-CALL

.user the to hazardous be will and warranty any invalidate will this with comply to Failure .adjusted be should components sealed No NOTE:

.possible as soon as call to engineer an for made be will Arrangements .Centre Contact Worcester the call correctly operate to fails still appliance the instructions the following after If,

.correctly set are controls all ensuring Instructions Lighting and Notes Information, General the to refer please – inconvenience and frustration mention to not – money and time save you help to So,

.malfunction apparent the for explanation simple a often is there as alarms, false be to prove breakdowns or faults appliance reporting centre contact our to made calls all of 30% than More

OPERATE

TO FAILS APPLIANCE

Fig. 1. Controls.

Temperature

control

Boiler

Burner

Lock-out

demand

on

 

8

9

Page 3
Image 3
Bosch Appliances 19/24CBI Operation Of Controls, Operate To Fails Appliance, Notes General, Boiler Reset Button, 19/24CBi