E19-310DC

Installation

Assembly of Components

NOTE: If tee (Item 7) is used as a supply inlet, use plug (Item 7) on tee (Item 2).

7

BSP threads this end

9

9.1 9.2

11

9.3 9.4

12

13

NOTE: Use

8

6

 

2

 

5

 

19

Flow 15.4

9.5Control

9.11

This End

15.3

 

 

15.2

1-1/4" BSP Supply Inlet (BSP threads are noted

with black line on threads)

5

14.1

teflon tape 14 only.

10

17

18

16

15.1

14.2

14.3

22

 

 

4.4

 

 

 

 

 

4.2

 

4.1

 

4.7

4.12

 

 

 

 

4

4.12

 

4.6

 

4.3

4.5

 

4.10

4.2

4.71

 

 

 

4.11

 

4.9

 

 

 

 

23

Test-operate valve(s) each week and sign below.

Report any malfunctions immediately.

Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden.

Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.

Date

Signed

Date

Signed

Datum

Unterschrift

Date

Signed

Date

Signe

Date

Signed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

21

20

HANDLE NOTE: Close the cover and put the pin through the clip to keep closed.

Figure 2

2

1-1/4" BSP

Drain Outlet

 

 

1

NOTE: Items 4.1–4.12 come preassembled as Item 4. Items 9.1–9.5 come preassembled as Item 9. Items 14.1–14.3 come preassembled as Item 14.

4

6/25/07

Bradley Corporation • 215-163DCE Rev. Z; EN 06-532F

Page 4
Image 4
Bradley Smoker E19-310DC installation instructions Assembly of Components