Briggs & Stratton 13D1-(19) PPO, 13D1-19 manual Positioning Pump, Suction and Discharge Piping

Models: 13D1-(19) PPO 13D1-19

1 28
Download 28 pages 519 b
Page 9
Image 9

 

OM−05463

 

10 SERIES

 

 

 

 

 

 

 

 

c. Carefully read all tags, decals, and markings

 

 

 

 

 

 

on the pump assembly, and perform all duties

 

 

 

 

 

 

indicated.

 

 

 

 

 

 

 

 

 

 

 

 

 

d. Check levels and lubricate as necessary. Re-

The pump assembly can be seriously

 

damaged if the cables or chains used to lift

 

fer to LUBRICATION in the MAINTENANCE

 

and move the unit are improperly wrapped

 

AND REPAIR section of this manual and per-

 

around the pump.

 

form duties as instructed.

 

 

 

 

 

 

 

 

Mounting

 

e. If the pump and engine have been stored for

 

 

 

more than 12 months, some of the compo-

Locate the pump in an accessible place as close as

 

nents or lubricants may have exceeded their

practical to the liquid being pumped. Level mount-

 

maximum shelf life. These must be inspected

ing is essential for proper operation.

 

or replaced to ensure maximum pump serv-

The pump may have to be supported or shimmed

 

ice.

 

to provide for level operation or to eliminate vibra-

 

 

 

 

 

 

 

 

 

 

tion.

If the maximum shelf life has been exceeded, or if

 

 

anything appears to be abnormal, contact your

To ensure sufficient lubrication and fuel supply to

Gorman-Rupp distributor or the factory to deter-

the engine, do not position the pump and engine

mine the repair or updating policy. Do not put the

more than 15_ off horizontal for continuous opera-

pump into service until appropriate action has

tion. The pump and engine may be positioned up

been taken.

to 30_ off horizontal for intermittent operation

 

 

 

 

 

only; however, the engine manufacturer should be

 

 

 

 

 

consulted for continuous operation at angles

POSITIONING PUMP

greater than 15_.

 

 

 

 

 

Clearance

 

 

 

 

 

When positioning the pump, allow a minimum

 

 

 

 

 

 

 

 

 

 

clearance of 18 inches (457 mm) in front of the

 

 

 

 

 

back cover to permit removal of the cover and easy

Use lifting and moving equipment in

access to the pump interior.

good repair and with adequate capacity

 

 

to prevent injuries to personnel or dam-

SUCTION AND DISCHARGE PIPING

age to equipment. The bail is intended

 

 

for use in lifting the pump assembly

 

 

only. Suction and discharge hoses and

Pump performance is adversely effected by in-

piping must be removed from the pump

creased suction lift, discharge elevation, and fric-

before lifting.

tion losses. See the performance curve and notes

 

 

 

 

 

 

 

 

 

 

on Page E-1 to be sure your overall application al-

Lifting

lows pump to operate within the safe operation

range.

 

 

 

 

 

Use lifting equipment with a capacity of at least 650

 

 

pounds (295 kg.). The pump weighs approxi-

Materials

mately 130 pounds (59 kg.) not including the

 

 

weight of accessories or suction and discharge

Either pipe or hose maybe used for suction and

piping. Customer installed equipment such as suc-

discharge lines; however, the materials must be

tion and discharge piping must be removed before

compatible with the liquid being pumped. If hose is

attempting to lift.

used in suction lines, it must be the rigid-wall, rein-

 

 

 

 

 

 

 

 

PAGE B − 2

INSTALLATION

Page 9
Image 9
Briggs & Stratton 13D1-(19) PPO, 13D1-19 manual Positioning Pump, Suction and Discharge Piping