Briggs & Stratton manual Quick Setup List, LT-200 Series, while battery is charging, times

Models: LT-200

1 14
Download 14 pages 51.89 Kb
Page 3
Image 3
 Quick Setup List -

LT-200 Series

o Charge the Battery (Note: proceed with other setup steps Quick Setup List -

Page

Setup Procedure

Steps to Perform

4

Uncrating

o Remove Crate & Banding.

 

 

o Place Transmission Release Lever in PUSH position & Roll

 

 

Tractor forward off skid.

 

 

 

4

Battery Charging &

o Charge the Battery (Note: proceed with other setup steps

 

Installation

while battery is charging).

 

 

o Install Battery.

5Check Fluid Levels

o o

Check Transmission fluid level. Fill & check Engine oil level.

6

SAFETY CHECKS

o Check for LOOSE HARDWARE.

 

 

o Check all OPERATOR CONTROLS.

 

 

o Test PARKING BRAKE.

 

 

o Perform MOWER BLADE STOPPING CHECK.

 

 

(Blade must stop within 5 seconds!)

 

 

o Check the Seat Switch connection.

 

 

o Perform SAFETY INTERLOCK SYSTEM CHECK.

 

 

 

7

Torque Mower Blades

o Torque mower blades to 45-55 ft.lbs. (61-75 Nm.

 

 

 

7

Burnish Electric Clutch

o Burnish Electric Clutch (run for 15 seconds, repeat 10

 

 

times).

 

 

 

7Reduce &

 

Check Tire Pressure

o Reduce & check Tire Pressure.

 

 

(Front Tires 12-15 psi, Rear tires 10-12 psi)

 

 

 

8

Lubrication

o Lubricate all grease & oil points.

 

 

 

10

Mower Assembly

o Install Mower Deck onto Tractor and Attach Belt

 

 

o Level Mower Deck (Side-to-side & Front-to-back).

 

 

 

14

Adjustment Procedures

o Gauge Wheels.

 

 

 

3/2007

3

TP 300-4517-00-RG-N

Page 3
Image 3
Briggs & Stratton Quick Setup List, LT-200 Series, o Charge the Battery Note proceed with other setup steps, times