Quick Setup List -
Page | Setup Procedure | Steps to Perform |
4 | Uncrating | o Remove Crate & Banding. |
|
| o Place Transmission Release Lever in PUSH position & Roll |
|
| Tractor forward off skid. |
|
|
|
4 | Battery Charging & | o Charge the Battery (Note: proceed with other setup steps |
| Installation | while battery is charging). |
|
| o Install Battery. |
5Check Fluid Levels
o o
Check Transmission fluid level. Fill & check Engine oil level.
6 | SAFETY CHECKS | o Check for LOOSE HARDWARE. |
|
| o Check all OPERATOR CONTROLS. |
|
| o Test PARKING BRAKE. |
|
| o Perform MOWER BLADE STOPPING CHECK. |
|
| (Blade must stop within 5 seconds!) |
|
| o Check the Seat Switch connection. |
|
| o Perform SAFETY INTERLOCK SYSTEM CHECK. |
|
|
|
7 | Torque Mower Blades | o Torque mower blades to |
|
|
|
7 | Burnish Electric Clutch | o Burnish Electric Clutch (run for 15 seconds, repeat 10 |
|
| times). |
|
|
|
7Reduce &
| Check Tire Pressure | o Reduce & check Tire Pressure. |
|
| (Front Tires |
|
|
|
8 | Lubrication | o Lubricate all grease & oil points. |
|
|
|
10 | Mower Assembly | o Install Mower Deck onto Tractor and Attach Belt |
|
| o Level Mower Deck |
|
|
|
14 | Adjustment Procedures | o Gauge Wheels. |
|
|
|
3/2007 | 3 | TP |