Bryan Boilers CLM-210 50 manual Replace old inefficient boilers without extra construction expense

Models: CLM-300 71 CLM-270 64 CLM-210 50 CLM-150 36 CLM-240 57 CLM-180 43 CLM-120 29

1 4
Download 4 pages 23.38 Kb
Page 2
Image 2
Replace old inefficient boilers without extra construction expense

Bryan KnockdownTM boilers for stage-by-stage entry through most standard door openings

Replace old inefficient boilers without extra construction expense

Sizes from 29 BHP to 191 BHP Bryan offers a large selection of hotwaterandsteamindustrialand commercialboilersthathavebeen designed for delivery to the site partiallyassembledinaneasy-to- knockdownconfiguration.

Reassemble inside The indi- vidual components will all easily fit through standard door open- ings. The boilers can then be readilyreassembledinsidesoyou can replace old boilers even in closed-in restricted space.

No demolition and reconstruction expense All of this can be done without tearing out walls, and without requir- ing the services of an ASME welder.

Bryan high efficiency performance All feature Bryan’s flexible water tube design which ensures fast, efficient conversion of fuel to heat, easy removal and replacement without welding. Dramatically reduced floor space is required by the compact designs and an absolute mini- mum area is needed to service water tubes.

A variety of knockdown stages Several states of partial to complete assembly are available depending on boiler size and on-site considerations. Consult your Bryan Boilers Representative to select the configuration best

suited to your particular require- ments. These are:

KD-1Boiler is shipped com- pletely assembled ready for knockdown, single screws, tack welds, not welded to base.

KD-2Disassembled after in- spection, shipped as vessel with tubes installed, base with burner (atmospheric) or refrac- tory (forced draft), controls, jacket and flue collector packed in separate crates.

KD-3Same as KD-2 except tubes removed from vessel.

KD-4(RV only) Partially assembled ready for knock- down. Single screws and tack welded, burner not in- stalled, refractory not poured, assembly required. Weld- ing required, but no ASME code work needed.

KD-5(RV only) All components disassembled after in- spection and shipped in crates. Refractory not poured, assembly with welding required, but no ASME code work needed.

KD-6All custom knockdown configurations other than above. Specify exact requirements and contact factory for availability and pricing.

Page 2
Image 2
Bryan Boilers CLM-210 50, CLM-150 36, CLM-120 29 manual Replace old inefficient boilers without extra construction expense