![](/images/new-backgrounds/1072453/724539x1.webp)
PLUMBING REQUIREMENTS
This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and
620 kPa) from a 1⁄2" or larger supply line. A
NOTE –
This equipment must be installed to comply with the National Plumbing Code of Canada and the Canadian Food Inspection Agency. For models installed outside Canada, you must comply with the applicable Plumbing/Sanitation Code for your area.
PLUMBING HOOK-UP
NOTE - If a backflow preventer is required by code, a shock arrestor should be installed between backflow pre- venter and dispenser. Installing the shock arrestor as close to dispenser as possible will provide best results.
1.Flush water line and securely attach it to the flare fitting or quick disconnect located on bottom of brewer.
2.Turn on the water supply.
INITIAL SET-UP
CAUTION – The brewer must be disconnected from the power source throughout the initial
1.Remove the front panel beneath the sprayhead. Rotate the control thermostat knob fully counterclockwise to the “OFF” position.
2.Connect the brewer to the power source. Water will begin flowing into the tank.
3.When water stops flowing into the tank, rotate the control thermostat knob fully clockwise to the “ON” position and replace the front panel.
4.Wait approximately twenty minutes for the water in the tank to heat to the proper temperature.
5.Place an empty server beneath either of the brew stations. Place its associated Selector switch in the desired position, the On/Off switch in the upper position and initiate a brew cycle.
6.Place the On/Off switch in the lower “OFF” position after water has stopped flowing from the funnel, and check the water volume in the server. It should be 64 oz (1/2 gallon), 128 oz (1 gallon), 196 oz
7.(A) If not, adjust the timer for that brew station as required. Refer to Adjusting Brew Volumes.
(B)If necessary adjust the needle valve to achieve desired water volume to be bypassed around the coffee fil-
ter
in the funnel.
NOTE: To increase the water bypass turn the needle valve counterclockwise, to decrease the water bypass turn the needle valve clockwise. An adjustment of the needle valve will require a timer adjustment for volume of 1 gallon
8.Repeat step 7 until the proper water volume is achieved.
9.Repeat steps 5 through 8 for the other brew station.
10.The brewer is now ready for use in accordance with the coffee brewing instructions.
ADJUSTING BREW VOLUMES
CAUTION - Disconnect the power source from the brewer prior to the removal of any panel for the replacement or adjustment of any component.
NOTE: Prior to setting or modifying batch sizes, check that the brewer is connected to water supply, the tank is properly filled, and a funnel and server are in place.
1.Modifying batch sizes. To modify a batch volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board.
Page 5 | 28222 111808 |
|