ADJUSTING BREW VOLUMES (Cont,)
To increase a batch size. Press and hold the START or BREW switch until three clicks are heard. Release the switch (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory) and press it again one or more times. Each time the switch is pressed, two seconds are added to the brew time period. Allow the brew cycle to finish in order to verify that the desired volume has been achieved.
To decrease a batch size. Press and release the START or BREW switch once for every
2.Setting batch sizes. To set a batch volume, first check that the SET/LOCK switch is in the “SET” position on the circuit board. Press and hold the START or BREW switch until three distinct clicks are heard, and then release the switch. (Failure to release the switch within two seconds after the third click causes the volume setting to be aborted and previous volume setting will remain in memory). View the level of the liquid being dispensed. When the desired level is reached, turn the ON/OFF switch to “OFF” (lower). The brewer remembers this volume and will continue to brew batches of this size until the volume setting procedure is repeated.
NOTE: When brewing coffee, batch volumes will decrease due to absorption by the coffee grounds.
3.Setting programming disable feature. If it becomes necessary to prevent anyone from changing brew times once programmed, you can set the SET/LOCK switch to the “LOCK” position. This will prevent any program- ming to be done until switch is once again placed in the “SET” position.
OPERATING CONTROLS
ON/OFF MAINSWITCH
ENABLE |
BREW |
a
d | c | b | e |
(a)MAIN ON/OFF SWITCH
This switch, located under the brewer behind the right front leg, turns power on and off to all components in the brewer.
(b)START SWITCH
Momentarily pressing and releasing this switch starts a brew cycle when the On/Off switch is in the lighted upper position.
NOTE: The On/Off switch must be in the lighted upper position to initiate and complete a brew cycle.
(c)ENABLE BREW (ON/OFF SWITCH)
Placing the switch in the unlighted lower position cuts power to the timer and stops brewing. Stopping a brew cycle after it has been started will not stop the flow of water from the funnel. Placing the switch in the
lighted upper position supplies power to the timer and enables the brew circuit.
Page 6 | 28222 010708 |
|