ELECTRICAL REQUIREMENTS
WARNING - The brewer must be disconnected from the power source until specified in Initial
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
L2 RED
L1 BLACK
GREEN
L2 RED |
L2 |
L1 BLACK
L1
GREEN G
L2 RED | L2 RED | L2 | |
|
| ||
WHITE | WHITE | N | |
NEUTRAL | NEUTRAL | ||
| |||
L1 BLACK | L1 BLACK | L1 | |
|
|
| GREEN |
|
|
|
|
|
| GREEN |
|
| |||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| G |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
200 and 230 volt ac models | 120/208 and 120/240 volt ac models |
Note: This electrical service consists of 2 current carrying conductors (L1 and L2) and a separate conductor for earth ground.
Note: This electrical service consists of 3 cur- rent carrying conductors (Neutral, L1 and L2) and a separate conductor for earth ground.
ELECTRICAL HOOK-UP (Models without power cord)
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect electrical connections is not covered by warranty.
1.An electrician must provide electrical service as specified in conformance with all local, state and federal electrical codes.
2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3.Remove the front panel beneath the sprayheads to gain access to the terminal block.
4.Feed the cord through the strain relief and connect it to the terminal block.
5.Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re- place the front panel.
6.If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial
ELECTRICAL HOOK-UP (Models with power cord)
1.An electrician must provide electrical service as specified in conformance with all local, state and federal electrical codes.
2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source. NOTE - If the brewer was shipped without a plug on the power cord a qualified service personnel must select and install the proper UL listed grounding type attachment plug specified on the rear of the brewer.
3.Remove the front panel beneath the sprayheads to gain access to the terminal block.
4.Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
5.If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumb- ing has been hooked up, the brewer is ready for Initial
WARNING – Electrical connections must be made as specified above. Failure to follow these instructions can
result in personal injury, property or equipment damage.
Page 4 | 29877.4 031312 |
|