Bunn FMD-2 Plumbing Requirements, PLUMBING HOOK-UPEarly Models, PLUMBING HOOK-UPLate Models

Models: FMD-2

1 8
Download 8 pages 61.25 Kb
Page 5
Image 5
PLUMBING REQUIREMENTS

PLUMBING REQUIREMENTS

This dispenser must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kPa) from a 12” or larger supply line. A shut-off valve should be installed in the line before the dispenser. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 14” flare.

NOTE - Bunn-O-Matic recommends 14” copper tubing for installations of less than 25 feet and 38” for more than 25 feet from the 12” water supply line. At least 18 inches of an FDA approved flexible beverage tubing, such as reinforced braided polyethylene or silicone, before the brewer will facilitate movement to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow prevention to comply with federal, state and local codes. For models installed outside the U.S.A., you must comply with the applicable Plumbing /Sanitation Code for your area.

PLUMBING HOOK-UP (Early Models)

1.Securely attach the short piece of tubing on the water strainer assembly to the inlet fitting on the bottom of the dispenser.

2.Flush the water line and securely attach it to the flare fitting on the water strainer assembly.

3.Turn-on the water supply.

PLUMBING HOOK-UP (Late Models)

1.Flush the water line and securely attach it to the elbow fitting on the bottom of the dispenser.

2.Turn-on the water supply.

NOTE - Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed and maintained in accordance with federal, state and local codes.

PRESET TANK TEMPERATURE

Tank temperatures have been preset at the factory to 180°F (82°C). Bunn recommends that to provide the best quality beverage, the installer adjust the tank temperature to the powder product manufacturer’s recommended temperature for the hot powder product being used.

INITIAL fill & heat

CAUTION - The dispenser must be disconnected from the power source throughout the initial set-up, except when specified in the instructions.

1.Turn-on the water supply and connect the dispenser to the power source.

2.Water will automatically flow into the tank to the proper level and then shut-off. This will take less than five minutes.

3.When the tank is full of water, open the front door and place the heater switch in the “ON” (lower) position. A tank full of cold water will take approximately forty minutes for the water to heat on 120 volt versions or twenty minutes for 120/208 volt versions, 120/240 volt versions and 220-240 volt versions.

During this waiting period, complete these dispenser set-up steps:

a.Place the drip tray in front of the dispenser. Set the drip tray cover in place.

b.Place a set of keyholes in the cup locator plate over the screws beneath the hopper access door and push down gently.

c.Fill the hopper with the dry product to be dispensed.

5

29112 010413

 

Page 5
Image 5
Bunn FMD-2 Plumbing Requirements, PLUMBING HOOK-UPEarly Models, PLUMBING HOOK-UPLate Models, Preset Tank Temperature