Bunn IC3B Operating Controls, Coffee Brewing, A. Lighted On/Off Switch, C. Start Switch

Models: IC3B

1 9
Download 9 pages 11.88 Kb
Page 8
Image 8

OPERATING CONTROLS

A.Lighted On/Off Switch

ON - Placing the switch in the lighted upper position allows the start switch to activate a brew cycle.

OFF - Placing the switch in the lower position stops the brew cycle. Stopping a brew cycle after it has been started will not stop the flow of water into the funnel until the tank syphons down to its proper level.

NOTE - The switch should always be placed in the “OFF” position after a brew cycle and whenever the brewer is unattended.

B.Full/Half Batch Selector Switch

Placing the switch in the upper or lower position will set the brewer to deliver the desired brew volume. Both selections can be adjusted to a desired brew volume (refer to ADJUSTING BREW VOLUMES).

C.Start Switch

Starts a brew cycle when the lighted On/Off switch is in the “ON” position.

D.Master ON/OFF Switch

Enables and disables power to the control board and other circuitry.

WARNING - This switch does not remove AC power from the entire dispenser. Disconnect power source before servicing the dispenser.

COFFEE BREWING

1.Begin each brew cycle with a clean empty brew funnel and dispenser. (Be sure the dispenser lid doesn’t interfere with the flow of dilution water.)

2.Insert a BUNN 3-gallon urn filter into the funnel.

3.Pour the recommended amount of fresh coffee into the filter.

4.Level the bed of coffee grounds by gently shaking.

5.Slide the funnel into the funnel rails until it stops.

6.Place the On/Off switch in the lighted “ON” position.

7.Place the batch selector switch in the desired position.

8.Momentarily press the start switch.

CAUTION - The funnel contains hot liquids. Remove funnel slowly.

9.Carefully remove the funnel and discard the used filter when coffee no longer drips from the funnel.

10.Place the lighted On/Off switch in the “OFF” position to prevent a false start.

11.Fresh Brewed Product is available at the faucet.

Page 8

10792 072408

 

Page 8
Image 8
Bunn IC3B service manual Operating Controls, Coffee Brewing, A. Lighted On/Off Switch, B. Full/Half Batch Selector Switch