Bunn ULTRA-1 service manual Assembly Following Cleaning

Models: ULTRA-1

1 17
Download 17 pages 28.06 Kb
Page 15
Image 15
ASSEMBLY FOLLOWING CLEANING

ASSEMBLY FOLLOWING CLEANING

1.Install the seal(s) over the flange at the rear of the cooling drum(s) and press the seal(s) firmly into place as shown.

4.Thoroughly rinse the hopper(s) and install over the auger(s) and cooling drum(s).

7.Position the faucet seal and return spring in the faucet valve.

2.Align the auger shaft(s) with the auger(s). Push the auger(s) as far as they will go and rotate so the flat face of the auger shaft is aligned with the flat face of the auger nose.

5.Slide into place and push down until the hopper lock plunger(s) snap into place. On models with autofill, reconnect fill hoses and level probe to hopper.

8.Slide the faucet valve assembly into place on the hopper.

3.Install auger nose bushing into inside front of hopper.

6.Set the lids on the hopper(s) and plug in the hopper lid lamp cord(s).

9.Press down on the valve to com- press the spring. Position the faucet handle over the faucet valve one side at a time and snap into place on the hopper.

10.Assemble the drip tray.

11.Turn ON augers and cooling function to desired settings.

15

40563 042910

 

Page 15
Image 15
Bunn ULTRA-1 service manual Assembly Following Cleaning