Bunn ULTRA-1 service manual Initial setup cont

Models: ULTRA-1

1 17
Download 17 pages 28.06 Kb
Page 5
Image 5
Initial setup (cont.)

Initial setup (cont.)

9.Align the auger shaft with the flat fin of the auger. Push the augers as far as they will go and rotate them so the flat fin is facing up.

12.Slide the hopper(s) into place and push down until the hop- per lock plunger snaps into place. For models without PAF, proceed to step 15.

15.Set the lid(s) on the hopper(s). Lift slightly and slide back or front for filling.

10.Install auger nose bushing into inside front of hopper.

13.For models with PAF, install level probes into slots at top rear of PAF hoppers.

16.Plug in the hopper lid lamp cord(s).

11.Thoroughly rinse the hoppers and install them over the augers and cooling drums.

14.Install PAF unit onto platform and plug power cord into rear of platform. Plug platform power cord into proper outlet. (Refer to PAF manual for water con- nections)(Proceed to step 17)

17.Assemble the drip tray.

5

40563 110207

 

Page 5
Image 5
Bunn ULTRA-1 service manual Initial setup cont