IMPORTANT: READ THESE INSTRUCTIONS CAREFULLY BEFORE PROCEEDING WITH THE INSTALLATION OF BOILER. POST INSTRUCTIONS NEAR BOILER FOR REFERENCE BY OWNER AND SERVICE TECHNICIAN. MAINTAIN INSTRUCTIONS IN LEGIBLE CONDITION.

NOTE: — The equipment shall be installed in accordance with those installation regulations in force in the area where the installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made.

All wiring shall be made in accordance with the National Electrical Code and/or local regulations.

SECTION I - INSTALLATION INSTRUCTIONS

Page 3

SECTION II - OPERATING AND SERVICE INSTRUCTIONS

Page 5

CLEARANCE REQUIREMENTS

 

 

 

 

 

 

 

 

 

 

 

Approved for Closet & Alcove

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation with minimum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For Service Accessibility clearance to combustible material*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEFT SIDE

 

18"

 

18"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RIGHT SIDE

 

6"

 

0"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOP

 

 

9"

 

9"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOTTOM

 

9"

 

15"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REAR

 

 

0"

 

0"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FRONT

 

For Door Removal - 24"

2" Closet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18" Alcove

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Closet Installation Requires Two Ventilation Openings, one located at

 

 

 

 

 

 

 

 

 

 

 

 

 

 

top and one at bottom, each opening to have 25 sq. in. net free area.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Water Flow Rate -

 

 

 

 

 

 

 

 

KW

 

 

 

 

 

 

 

Water

(GPM) Based on 20°F

Boiler

DOE HEATING

AFUE

 

Amps

No. and Size

Recommended Power

 

Appx. Wt.

Temp. Rise and Boiler

 

Rating

 

Contents

Model

CAPACITY, BTU/HR

%

 

 

 

(240V)

of Elements

Supply to Boiler

 

Full (Lb.)

Capacity At

 

 

 

 

 

 

(240V)

 

 

 

(Gal.)

 

 

 

 

240V

220V

208V

 

 

 

 

 

 

Min.*

Max. Fuse

 

 

 

240V

220V

208V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wire Size

Size-Amps.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

412

41,000

35,000

31,000

100

 

 

12

50

4-3KW

#6 AWG

60

 

155

4.1

3.5

3.1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

416

55,000

46,000

41,000

100

 

 

16

70

2-3KW (top)

#4 AWG

80

 

155

5.5

4.6

4.2

 

 

2-5KW (bottom)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

420

68,000

58,000

52,000

100

 

 

20

85

4-5KW

#2 AWG

90

 

155

6.8

5.8

5.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DOE Heating Capacities are shown. Where the boiler and piping are in the heated space, the boiler may be selected on the basis of the DOE Heating Capacity. Where a piping loss and/or a pickup loss will exist, add this loss to the building loss to determine the total heating requirements. Where a piping loss only will exist but cannot be calculated, multiply the calculated building loss by a 1.15 factor to determine the total heating requirement.

*For runs in excess of 50 ft. consult local or national electrical code.

Maximum Allowable Working Pressure: 30 PSI (Water Only)

Figure 1: Dimensions and Specifications

2

Page 2
Image 2
Burnham E4 manual Dimensions and Specifications