DEALER PREPARATION CHECK LIST

ATH / FTH FINISHING MOWERS

BEFORE DELIVERING MACHINE — The following check list should be completed. Use the Operator’s Manual as a guide.

o1. Assembly completed.

o2. Gearboxes filled with oil.

o3. All fittings lubricated.

o4. All shields in place and in good condition.

o5. All fasteners torqued to specifications given in Torque Chart r 6. All decals in place and readable. (See decal page.)

o7. Overall condition good (i.e. paint, welds)

o8. Operators manual has been delivered to owner and he has been instructed on the safe and proper use of the cutter.

o9. Warranty information has been filed online with Bush Hog.

Dealer’s

Signature

THIS CHECKLIST TO REMAIN IN OWNER’S MANUAL

It is the responsibility of the dealer to complete the procedures listed

above before delivery of this implement to the customer.

3

Page 5
Image 5
Bush Hog ATH 720, FTH 600 manual Dealer Preparation Check List ATH / FTH Finishing Mowers