Installing the SWPIM-BRI

Rail Guides

Host Platform

View of Host Connector End

SWPIM-BRI

Network Connector End

Thumbscrew

LNK

 

STS

SWPIM-BRI

 

install

Figure 1-1 Installing the SWPIM-BRI into the Host Platform

8.Fasten the SWPIM-BRI with the thumbscrew.

9.Replace power to the host platform, if necessary. Check to see that the host platform LED indicators go to their normal configuration. If they do not, remove the SWPIM-BRI from the host platform and contact Cabletron Systems.

Do not connect any WAN cables until the SWPIM-BRI has been

!configured in software. The phone company can shut down a

CAUTION

line that has an unconfigured connection on it.

 

10.The SWPIM-BRI must be configured before the WAN connection is made. Once the SWPIM-BRI has been configured, the host platform must undergo a soft or hard restart in order for the SWPIM-BRI to be recognized and for traffic to pass. Refer to the appropriate software manual to configure the SWPIM-BRI.

SWPIM-BRI Installation Guide

1-3

Page 23
Image 23
Cabletron Systems manual Installing the SWPIM-BRI