
Operating Instructions |
|
|
|
| NB003006 | ||||
Operating Instructions | 5. | Depress the Work | 5. Always unload all fasteners before | ||||||
(Continued) |
| Contact Element |
| removing tool from service. |
| ||||
Sequential Trip Safety |
| (WCE) against the |
| Unloading is the reverse of loading, | |||||
| work surface without |
| except always disconnect the air | ||||||
Mechanism |
|
| |||||||
This tool is equipped with a sequential |
| pulling the trigger. |
| hose before unloading. |
|
| |||
| The nailer must not operate. |
|
|
|
|
| |||
trip safety mechanism. When the |
| Adjusting the Nail Penetration | |||||||
| Do not use the tool if it operates | ||||||||
operator depresses the Work Contact |
| 1. Regulate the air pressure to 60 psi at | |||||||
| without pulling the trigger. Personal | ||||||||
Element (WCE) against the work surface |
| ||||||||
|
| the nailer. |
|
|
| ||||
| injury may result. |
|
|
|
| ||||
and then pulls the trigger, a fastener |
|
|
|
|
| ||||
|
|
|
|
|
| ||||
6. | Remove the nailer | 2. Connect the air supply and test for | |||||||
will be driven. | |||||||||
| penetration by driving nails into a | ||||||||
|
|
| from the work |
| |||||
Operating a sequential trip |
|
| sample piece of wood. If the nails do | ||||||
| surface. The Work |
| |||||||
nailer |
|
| not achieve the desired penetration, | ||||||
| Contact Element |
| |||||||
1. | Release trigger and |
|
| adjust the air pressure to a higher | |||||
| (WCE) must return to |
| |||||||
| place nose of tool |
| its original down position. The nailer |
| setting until the desired penetration | ||||
| against work surface. |
| must not operate. Do not use |
| is achieved. Do not exceed 100 psi at | ||||
|
|
| the tool if it operates while lifted |
| the nailer or durability of the nailer | ||||
|
|
|
| will be reduced. |
|
| |||
2. | Depress the Work |
| from the work surface. Personal |
|
|
| |||
|
|
|
|
|
| ||||
| injury may result. |
|
|
|
|
| |||
| Contact Element |
|
|
|
|
|
| ||
|
|
|
| 100 |
|
| 100 | ||
| (WCE) against the | 7. Pull the trigger and |
|
|
| ||||
|
| 50 | 150 | 50 | 150 | ||||
| work surface and pull |
| depress the work |
| 0 | 200 | 0 | 200 | |
| the trigger to drive a |
| contact element |
| |||||
|
|
|
|
|
|
| |||
| fastener. |
| (WCE) against the |
|
|
|
|
| |
3. | Release the trigger |
| work surface. The |
|
|
|
|
| |
| nailer MUST NOT operate. |
|
|
|
|
| |||
| and lift the tool from |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| ||
| the work surface | 8. | Depress the Work |
|
|
|
|
| |
| after each fastener is |
| Contact Element | User - Maintenance |
|
| |||
| driven. |
| (WCE) against the | Instructions |
|
| |||
Checking the Work contact |
| work surface. Pull the | Clearing A Jam From The Tool | ||||||
| trigger. The nailer | ||||||||
element (WCE) |
|
|
|
|
|
| |||
| MUST operate. | 1. | Disconnect the air |
|
| ||||
| Check the operation |
|
|
| |||||
|
| An improperly |
| supply from the |
|
| |||
| of the Work Contact |
|
|
|
| ||||
|
| functioning tool |
| nailer. |
|
|
| ||
Element (WCE) trip mechanism before |
|
|
|
|
| ||||
must not be used. Do not actuate the |
|
|
|
|
| ||||
each use. The WCE must move freely | 2. | Remove all nails from |
|
| |||||
tool unless the tool is placed firmly |
|
| |||||||
without binding through its entire | against the work piece. |
| the magazine (See |
|
| ||||
travel distance. The WCE spring must |
|
|
| ||||||
|
|
| Loading/ Unloading |
|
| ||||
return the WCE to its fully extended | Loading/Unloading The Nailer |
|
|
| |||||
| The Nailer). Failure |
|
| ||||||
position after being depressed. Do | 1. Always disconnect the tool from the |
|
|
| |||||
not operate the nailer if the WCE trip |
| to do so will cause the nails to eject | |||||||
mechanism is not operating properly. |
| air supply before loading fasteners. |
| from the front of the nailer when | |||||
Personal injury may occur. | 2. Lift up on the latch. |
| the nose assembly is removed. | ||||||
|
|
| |||||||
1. | Disconnect the air |
| Pull back on the | 3. Pull red tab forward |
|
| |||
| supply from the |
| magazine cover. |
| on quick clear nose. |
|
| ||
| nailer. | 3. Insert a stick of |
| Set aside nose door to |
|
| |||
|
|
|
|
| |||||
2. Remove all nails from |
| Campbell Hausfeld |
| expose and remove |
|
| |||
| the magazine (see |
| nails or equivalent |
| jammed fastener. |
|
| ||
| Loading/ Unloading). |
| (See Fastener Section) | 4. Reinstall nose in reverse order in | |||||
3. Make sure the trigger |
| into the magazine. Make sure | |||||||
|
| step 3. |
|
|
| ||||
| the pointed ends of the nails are |
|
|
|
| ||||
| and work contact |
|
|
|
|
| |||
|
|
|
|
|
|
| |||
|
| resting on the bottom ledge of the | 5. | Make sure the trigger |
|
| |||
| element (WCE) move |
|
|
| |||||
|
| magazine when loading. Make sure |
| and Work Contact |
|
| |||
| freely up and down |
|
|
|
| ||||
|
| the nails are not dirty or damaged. |
| Element (WCE) move |
|
| |||
| without sticking or |
|
|
|
| ||||
|
|
|
| freely up and down |
|
| |||
| binding. | 4. | Push the magazine |
|
|
| |||
|
| without sticking or |
|
| |||||
4. | Reconnect air supply |
| cover forward until |
|
|
| |||
|
| binding. |
|
|
| ||||
| the latch catches. |
|
|
|
| ||||
| to the nailer. |
|
|
|
|
| |||
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
5 | www.chpower.com |