HEATING L COOLlNG
SAFETY CONSIDERATIONS
Installing,
Only trained, qualified installers and service techni- cians should install, start up and service this equipment.
When working on air conditioning equipment, observe
precautions in the literature and on tags, stickers and labels attached to the equipment.
Follow all safety codes. Wear safety glasses and work gloves. Use care in handling equipment.
30GT 1K,HL /ckage
INTRODUCTION
These instructions cover field installation of the Acces- sory Hot Gas B y ass Valve and solenoid pilot valve on the following chi Plers:
30HK,HL015 through 060 (50 and 60 Hz) 30GB040,045,055,070 (60 Hz), Flotronic’”
30GB040,046,050,055,070 (50 Hz), Flotronic’” 30GB075 through 200 (50 and 60 Hz), Flotronic’” 30GTOl5,025,030,035 (60 Hz)
30GT020,025,030 (50 Hz)
On Flotronic chillers with no unloaders or 2 unloaders, the accessory hot gas bypass must be added to both circuits because of ati automatic
INSTALLATION
Step 1 - Examine Packa e Contents - Pack- age includes hot gas bypass va Bve, solenoid pilot valve
and instructions. Examine each item. If any part is damaged or missing, file a claim immediately with the shipping agent.
Step 2 - Install Piping
III
| C O O L E R |
| 3 LINE | |
| w&i+ LIQUID LINE (CIRCUIT ~0.1) | |||
|
|
| I |
|
| STUB ’ | mm | ||
| I | |||
(SEALED FROM |
| BYPASS VALVE {;.OD CONN.) SEE N O T E 2 | ||
FACTORY 1 |
|
|
SEE NOTE I
;;;BN&<A;ED FROM FACTORY 1 c
HOT GAS DISCHARGE
C O N D E N S E R
TXV - TH ER MOSTATI.C EXPANSION VALVE
b & FACTORY PIPING
- - -
b - - - a FIELD PIPING
NOTES:
1.
2.The bypass valve In this package has
3.On 30GB units, a change from S/sin. to gin. must be made either at the valve or at the stubs.
Fig. 1 - Schematic Piping; 30HK,HLO15-060; 30GT015-035
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
P C 1 1 1 | Catalog No. | Printed in U.S.A. | Form | RI 1 | Replaces: |