Carrier 320720---751 THRU ---761 installation instructions Two-Stage, Two-Speed and Fixed-Capacity

Models: 320720---751 THRU ---761

1 6
Download 6 pages 55.18 Kb
Page 3
Image 3
Fig. 1 - Two-Stage, Two-Speed and Fixed-Capacity

COMBUSTION-AIR

INTAKE

CONNECTION

BURNER

PRIMARY HEAT

BURNER

EXCHANGER

ENCLOSURE

(BEHIND CELL

 

INLET PANEL)

 

GAS VALVE

ENCLOSURE

AUXILIARY

PRIMARY HEAT

JUNCTION BOX

EXCHANGER

VENT OUTLET

(BEHIND CELL

INLET PANEL)

CONDENSING

CAP AND

HEAT

CLAMP

EXCHANGER

(UNUSED

(BEHIND CELL

DRAIN

INLET PANEL)

CONNECTION)

PRESSURE

 

SWITCHES

VENT OUTLET

INDUCER MOTOR

CONTROL

 

CONDENSATE

CENTER

BLOWER

TRAP

MOTOR AND

ACCESS PANEL

SAFETY

BLOWER

INTERLOCK

ASSEMBLY

SWITCH

AIR FILTER AND

RETAINER

COMBUSTION-

AIR INTAKE

CONNECTION

AUXILIARY

JUNCTION BOX

VENT OUTLET

INDUCER MOTOR

WIRE

CONNECTOR

CONDENSING

HEAT

EXCHANGER

(BEHIND CELL

INLET PANEL)

INDUCER

HOUSING

DRAIN TUBE

CONDENSATE

TRAP

AIR FILTER

AND RETAINER

GAS VALVE

CAP AND CLAMP (UNUSED DRAIN CONN.)

INDUCER MOTOR

VENT

OUTLET

PRESSURE

SWITCHES

Model(s) in Upflow OrientationInstall Primary Cell Inlet PanelFig. 2 - Variable-Speed Model in Upflow OrientationReinstall Inducer AssemblyReinstall Burner Enclosure AssemblyManual backgroundManual backgroundManual backgroundCONTROL

CENTER

BLOWER

ACCESS

PANEL

SAFETY

INTERLOCK

SWITCH

MOTOR AND BLOWER ASSEMBLY

320720

A01026

Fig. 1 - Two-Stage, Two-Speed and Fixed-Capacity

Model(s) in Upflow Orientation

Remove Inducer Assembly

1.If not previously disconnected, disconnect inducer motor wire connector at quick-connect.

2.If not previously disconnected, disconnect pressure switch wires.

3.Remove collector box pressure switch tube from pressure switch.

4.Remove four screws attaching inducer housing to cell pan- el.

NOTE: Inducer housing, inducer motor, and pressure switch(es) should be removed as 1 assembly.

Install Primary Cell Inlet Panel

1.Remove four screws attaching condensing heat exchanger assembly to primary cell inlet panel.

2.Remove screws attaching primary cells to primary cell in- let panel.

3.Remove main limit and shield from primary cell inlet pan- el. Note orientation of shield and direction of main limit for reassembly.

4.Remove primary cell inlet panel by lifting panel off con- densing heat exchanger collector box.

5.Slide new inlet cell panel over condensing heat exchanger collector box.

6.Attach primary cell inlet panel to primary cells by doing the following:

a.Center primary cell inlet panel over primary cell open- ings.

b.Use an awl to align holes and start ALL screws (provided in kit) in primary cells.

c.After all screws are started, check position of fiberglass gasket and tighten screws in cells.

7.Install main limit and shield in primary cell inlet panel.

A93407

Fig. 2 - Variable-Speed Model in Upflow Orientation

NOTE: Visually check location of main limit and shield to ensure shield is not touching primary cells. If shield is touching, short cycling of limit will occur.

8.Reinstall condensing heat exchanger assembly to primary cell inlet panel.

Reinstall Inducer Assembly

1.Inspect connector box gasket where inducer housing will mate.

NOTE: If gasket is damaged in any way, it must be repaired. To repair, apply a small bead of G.E. RTV 162, G.E. 6702, or Dow-Corning RTV 738 to damaged gasket area. Apply sealant releasing agent such as PAM cooking spray or equivalent (must not contain corn nor canola oil, halogenated hydrocarbons or aromatic content to prevent inadequate sealing) to inducer housing mating surface.

2.Attach inducer assembly to cell panel by aligning four screws through inducer housing spacers. Tighten screws to secure.

3.Attach collector box pressure switch tube to pressure switch. See tubing diagram of furnace for proper location attachment.

4.If control was removed from furnace with whole cell panel assembly, reconnect inducer motor wire connector at quick-connect.

5.If control was removed from furnace with whole cell panel assembly, reconnect pressure switch wires. Refer to wiring diagram on furnace for proper attachment.

Reinstall Burner Enclosure Assembly

1.Position burner enclosure gasket between the burner box and inlet cell panel and secure burner box on inlet cell panel using screws removed earlier.

2.Connect pressure tube to gas valve.

3.Inspect gasket, then install intake housing on burner en- closure.

3

Page 3
Image 3
Carrier 320720---751 THRU ---761 Two-Stage, Two-Speed and Fixed-Capacity, Install Primary Cell Inlet Panel