Cecilware VAE-J1 Preparation Of The Machine, Starting The Machine, Electrical Heating, Commutator

Models: VAE-J1

1 24
Download 24 pages 61.64 Kb
Page 9
Image 9
2. PREPARATION OF THE MACHINE

espresso coffee machine - instructions for the user

R

2. PREPARATION OF THE MACHINE

The preparation of the coffee machine and its installation must be performed by qualified staff.

WARNING

Use of the machine without all the installation operations having been carried out by technical personnel could damage it se- riously.

3. STARTING THE MACHINE

3.1 ELECTRICAL HEATING

Before starting the machine, make sure that the level of water in the boiler is higher than the minimum level on the level-check window (1). If there is no water (first installation or after boiler maintenance), it is necessary to fill the boiler in advance, so as to prevent overheating of the heating element. Proceed as follows:

1

Switch

Open the water tap of the water mains and of the softener.

Using manual fill (2) fill the boiler with water until the optimal level is restored. Turn the switch to position “1” and wait for the machine to warm up completely.

Commutator

Open the water tap of the water mains and of the softener.

Turn the switch to position “1” (electrical power supplied to the pump for automatic boiler filling and machine services) and wait for the boiler to be automatically filled with water. Turn the switch to position “2” (full electrical power supplied, including the heating element in the boiler) and wait for the machine to warm up completely.

3. STARTING THE MACHINE 2

 

0

 

1

2

Switch

 

 

0 3.1 ELECTRICAL HEATING 1

Commutator

WARNING

during the machine’s warm-up phase (roughly 20 minutes), the negative pressure valve will release steam for a few seconds until the valve itself closes

before using the machine, run deliveries dry with the filter holder attached for a few seconds to release any air which may be in the circuit, so that the delivery groups are completely heated

before using the machine, dispense a few servings of coffee to test the grinding and to check the operating pressure of the machine

e nglish - 9

Page 9
Image 9
Cecilware VAE-J1 manual Preparation Of The Machine, Starting The Machine, Electrical Heating, Commutator, Switch, e nglish