ASSEMBLY INSTRUCTIONS

11

BB

DA

A

*

B

12

CC

A

13

DA

DB

B

TIP: To position the left side shelf, insert the two hooks on the side shelf assembly into the two openings located on the upper left side panel (BB).

11.Assemble the right side shelf assembly to the cart assembly, as shown in figure B.

* #1 - ¼” x 38mm Screw (x1)

#2 - ¼” x 16mm Screw (x4)

#4 - ø7 Lock Washer (x5)

#5 - ø7 Washer (x5)

12a. Remove the hardware that is pre-assembled to the side burner valve bracket (CC), as shown in figure A. Insert the side burner valve stem through the rear of the left side shelf fascia (DB). Assemble the side burner valve to the side shelf fascia, using the hardware removed.

12b. Assemble the Side burner control knob (#13) to the side burner valve (CC).

#13. Knob (x1)

11

Page 13
Image 13
Centro 6800 warranty #13. Knob