UVDR Series Unvented Gas Fireplaces
KT145
Fig. 14 Secure the inlet collar assembly.
Caulking | Duct Ter- | |
mination | ||
|
Rain
Cap
Wall
FP1061
Fig. 15 Caulk and install duct termination/rain cap in place.
Operating Precautions and Instructions
Operation is automatic. A slight negative pressure inside the house will open the barometric flapper valve.
Periodically inspect the duct termination for any block- age. Correct if necessary.
10 | 20007469 |