INSTALLATION STEP 1

Unfinished

Determine the Header BracketCeiling

Location

Header Wall

2x4

To prevent possible SERIOUS INJURY or DEATH:

Vertical Centerline

• Header bracket MUST be RIGIDLY fastened to structural

of Garage Door

 

support on header wall or ceiling, otherwise garage door

 

might not reverse when required. DO NOT install header

 

bracket over drywall.

 

• Concrete anchors MUST be used if mounting header bracket

 

or 2x4 into masonry.

 

• NEVER try to loosen, move or adjust garage door, springs,

 

cables, pulleys, brackets, or their hardware, all of which are

 

under EXTREME tension.

Level

• ALWAYS call a trained door systems technician if garage

(optional)

door binds, sticks, or is out of balance. An unbalanced

 

garage door might not reverse when required.

 

SECTIONAL DOOR ONLY

1.Close the door and mark the inside vertical centerline of the garage door.

2.Extend the line onto the header wall above the door.

You can fasten the header bracket within 4 feet

 

 

 

 

 

 

 

 

 

 

 

 

 

(1.22 m) of the left or right of the door center only if

 

 

 

 

 

 

 

 

 

 

 

 

 

a torsion spring or center bearing plate is in the

 

 

 

 

Header Wall

way; or you can attach it to the ceiling (see page 9)

 

 

 

 

 

 

 

 

 

 

 

 

2" (5 cm) Track

 

 

 

 

 

 

when clearance is minimal. (It may be mounted on

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

the wall upside down if necessary, to gain

 

 

 

 

Highest

 

Point

 

 

 

 

 

 

approximately 1/2" [1 cm].)

 

 

 

 

 

of Travel

 

 

 

 

 

 

 

 

 

 

 

 

 

If you need to install the header bracket on a 2x4

 

 

 

 

 

Door

(on wall or ceiling), use lag screws (not provided)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to securely fasten the 2x4 to structural supports as

 

 

 

 

 

 

 

 

 

 

 

 

 

shown here and on page 9.

 

 

 

 

 

 

 

 

 

 

 

 

 

3. Open your door to the highest point of travel as shown.

 

 

 

 

 

 

 

 

 

 

 

 

 

Draw an intersecting horizontal line on the header wall

 

 

 

 

 

 

 

 

 

 

 

 

 

2" (5 cm) above the high point. This height will provide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

travel clearance for the top edge of the door.

 

 

 

 

 

 

 

 

 

 

 

 

OPTIONAL

CEILING

MOUNT

FOR

HEADER

BRACKET

2x4 Structural Supports

Sectional door with curved track

8