

Installation
1 

2


Remove the gate operator from it's package and make sure that all parts are included. Refer to General Information and Parts Identification. If any parts appear to be missing, contact dealer.
Temporarily plug the operator into 115 Volt outlet or extension cord.
Before beginning installation, test the gate operator by running the operator back and fourth 2 or 3 times. If the gate operator appears to have any shipping damage, contact a dealer.
The operator may be run back and fourth by momentarily touching the open input terminals together. The terminals can be touched together with a short length of wire, paper clip or needle nose pliers. With full systems capability circuit board, the open input terminals are 5 and 6.
Disconnect Power when finished!
8