INSTALLATION STEP 2

Install the Header Bracket

You can attach the header bracket either to the wall above the garage door, or to the ceiling. Follow the instructions which will work best for your particular requirements. Do not install the header bracket over drywall. If installing into masonry, use concrete anchors (not provided).

WALL HEADER BRACKET INSTALLATION

Center the bracket on the vertical centerline with the bottom edge of the bracket on the horizontal line as shown (with the arrow pointing toward the ceiling).

Wall Mount

Optional Mounting Holes

Mark the vertical set of bracket holes. Drill 3/16" pilot holes and fasten the bracket securely to a structural support with the hardware provided.

HARDWARE SHOWN ACTUAL SIZE

Lag Screw 5/16"-9x1-5/8"

CEILING HEADER BRACKET INSTALLATION

Extend the vertical centerline onto the ceiling as shown.

Center the bracket on the vertical mark, no more than 6" (15 cm) from the wall. Make sure the arrow is pointing away from the wall. The bracket can be mounted flush against the ceiling when clearance

is minimal.

Mark the side holes. Drill 3/16" pilot holes and fasten bracket securely to a structural support with the hardware provided.

- Header Wall -

2x4 Structural

SupportHeader Bracket

Horizontal

Line

Highest Point of

Garage Door Travel

Vertical

Centerline

of Garage

Door

Lag Screws 5/16"-9x1-5/8"

Door Spring

- Garage Door -

Vertical

Centerline

of Garage Door

- Finished Ceiling -

Vertical Centerline

of Garage Door

Header

Bracket

6" (15 cm) Maximum

Ceiling Mounting Holes

Door

Lag Screws

 

Spring

 

 

5/16"-9x1-5/8"

 

 

- Header Wall -

 

Garage Door

Vertical

 

Centerline

 

 

 

 

of Garage Door

13