ting deptth. Then retighten the two Clamping Screws. (See Figure A.)
Work Area and Workpiece Set Up:
1.Designate a well ventilated work area that is clean and
2.Use and lay this Hot Knife on a non- flammable surface only.
3.Always have multiple class ABC fire extinguishers nearby.
4.Route the Power Cord (21) along a safe route to reach the work area without creating a tripping hazard or exposing the Power Cord to pos- sible damage. The Power Cord must reach the work area with enough extra length to allow free movement while working.
5.There must not be hazardous ob- jects, such as utility lines or foreign objects, nearby that will present a hazard while working.
General Operating Instructions
1.Plug the Power Cord Plug (21) into the nearest 120 volt, grounded, elec- trical outlet.
2.Turn the Temperature Selector Knob
(9) to the desired temperature.
(See Figure A.)
•
•
•
•
•
3.Press and hold the Power Switch (19) to heat up the Blade (2). The Blade will reach the
(See Figure A.)
4.When the Blade (2) has reached the
5.When pressure on the Power Switch
(19)is released, power to the Blade
(2)is cut off and the Blade will cool down gradually. (See Figure A.)
6.The residual heat on the Blade
(2) takes several minutes to dissi- pate. Use caution while the Blade is still hot.
7.Unplug the Hot Knife from its electri- cal outlet.
8.Once the Hot Knife has completely cooled store the tool in a clean, dry, and safe location out of reach of chil- dren and other unauthorized persons.
SKU 66182 | For technical questions, please call | Page 8 |