OPERATING INSTRUCTIONS

NOTE: For additional information regarding the parts listed in the following pages, refer to the Assembly Diagram on page 13.

WARNING! Remove the Battery (28) from the tool and set the Rotation Button

(9)to its center, locked, position before making any adjustments, changing accessories, or storing the tool.

Accessory Grip (14)

Torque Indicator Arrow

Chuck (16)

Rotation Button (9)

Torque Setting Ring (15)

Trigger (10)

2-Head Bit (3)

Battery Pack (28)

Figure E.

1.To install a drill/screwdriver bit: with the chuck pointing away from you, hold the Chuck Sleeve firmly in place and turn the Chuck (16) counterclockwise. Insert the shank of the bit all the way into the Chuck. While holding the Chuck Sleeve in place, turn the Chuck clockwise to lock the bit in place. The Chuck accepts up to 1/2” diameter bits. Insert the appropriate bit for your application and tighten the Chuck firmly. (See Figure E., above.)

2.Secure the workpiece in place, using a vise or clamps (not included).

Warning! Never change Torque Setting while drill is still rotating, as this can damage the drill.

3.Decide on which setting to choose for application: Torque Settings (1-16):

The different numbers on the Ring are an indication of how much torque the screw- driver will apply to the bit before the clutch slips, allowing the bit to stop and helping

SKU 95848

For technical questions, please call 1-800-444-3353.

PAGE 10

Page 10
Image 10
Chicago Electric 95848 operating instructions Operating Instructions, Figure E