Installation Instructions | PACPC1 | |||
INSTALLATION |
| |||
Attaching to Drywall | (D) | |||
1. | Attach bracket (D) to drywall using two #6 x 1" drywall | |||
| ||||
|
| screws (L). (See Figure 1) | (C) | |
NOTE: Do NOT overtighten drywall screws. |
| |||
2. | Proceed to Installing Conditioner. |
| ||
|
| (D) |
| |
|
|
| (K) x 2 | |
|
|
| Conditioner to be Attached Horizontally | |
|
| (L) x 2 |
| |
|
| Figure 1 |
| |
Attaching to Wood Stud |
| |||
1. Drill two 0.08" pilot holes into wood stud. (See Figure 2) |
| |||
2. |
| Attach bracket (D) to wall using two #6 x 1" drywall |
| |
|
| screws (L). |
| |
3. |
| Proceed to Installing Conditioner. | Conditioner to be Attached Vertically | |
|
| Wood |
| |
|
| Stud | Figure 3 | |
|
|
| ||
|
| 1 | 2. Attach pole clamp (B) around the pole to the pole mount | |
|
|
| bracket using two | |
|
|
| screws (H), four 1/4" washers (N), and two spacers (M). | |
|
| (D) | (See Figure 4) | |
|
|
| ||
| 2 | (L) x 2 | (B) | |
|
|
| ||
|
| Wall |
| |
|
|
| (N) x 4 | |
|
|
| (M) x 2 | |
|
| Figure 2 |
| |
Attaching to |
| |||
1. |
| Attach bracket (D) to pole mount bracket (C) using two |
| |
|
| |||
NOTE: The bracket can be installed for either horizontal or | ||||
(H) x 2 | ||||
|
| vertical attachment of the conditioner. (See Figure 3) | (Horizontal Attachment Shown) |
Figure 4
5