Chief Manufacturing TPP Inspect The Mount Before Installing, Tpp Installation, Latching Flag

Models: TPP

1 7
Download 7 pages 59.17 Kb
Page 4
Image 4
INSPECT THE MOUNT

Instruction Manual

TPP

 

 

INSPECT THE MOUNT

BEFORE INSTALLING

IMPORTANT: Before installing the mount, make sure it has not been damaged during shipping.

1.Carefully inspect the mount for shipping damage. If any dam- age is apparent, call your carrier claims agent and do not con- tinue with the installation of the mount the until carrier has reviewed the damage.

TPP INSTALLATION

Assembly

1.Install the Nylon spacer on the stud in the corner of the face plate (see Figure 1).

2.Install the latching flag over the Nylon spacer.

3.Secure the latching flag to the face plate using the 1/4-20 Nylock nut loose enough to move but tight enough to remain in place when raised.

WARNING: It is the responsibility of the installer to verify that the structure to which the TPP is anchored will safety support the combined load of all attached components and equipment.

4.Securely anchor the back plate to the framework using Chief TPK accessory clamps or equivalent rated fasteners for the required load (see Figure 2).

5.Install the pitch-adjustable plate on the back plate and secure using four 5/16-18 X 1/2” hex head cap screws (see Figure 3).

Latching Flag

stud

10-24 Nut

Nylon Spacer

Figure 1. Install Flag

Figure 2. Anchor Back Plate

5/16-18 X 1/2” Hex Head Cap Screws TPP INSTALLATION

Figure 3. Pitch-Adjustable Plate to Back Plate

3

Page 4
Image 4
Chief Manufacturing TPP Inspect The Mount Before Installing, Tpp Installation, Latching Flag, stud, Anchor Back Plate