Installation, Operation
and
RENEWAL PARTS IDENTIFICATION
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 4 |
|
|
| NWHO |
|
|
|
| |||||||
|
|
|
| |||||||
|
|
|
|
|
| (Supersedes PE429) |
|
161-058065-001
FEBRUARY, 1986
2 x 3/4”
Slot
B
D
A 6” Outlet
Temperature
Control
6” Inlet
E 1”
813/16”
|
|
|
|
|
5 Conduit |
|
|
| |
Outlets |
|
|
| |
72° Apart |
|
|
| |
or |
| C | ||
6 Conduit | Mounting | |||
Outlets | Lug Centers | |||
60° Apart |
|
|
| |
|
|
| ||
|
|
|
|
|
|
|
|
|
|
Type NWHO-45, 72, 108
Circulation Heaters for
Regular and Fuel Oil
Heating
Specifications – Table A
|
|
|
|
| Dimensions (In.) |
| ||
|
|
| No. 3Ø |
|
|
|
|
|
Model | Volts 3Ø | kW | Circuits | A | B | C | D | E |
240 or 480 | 90 | 5 | 721/2 | 251/2 | 635/8 | 1813/16 | 121/2 | |
240 or 480 | 125 | 5 | 871/2 | 251/2 | 785/8 | 1813/16 | 121/2 | |
240 or 480 | 150 | 5 | 1021/2 | 251/2 | 935/8 | 1813/16 | 121/2 | |
240 or 480 | 175 | 5 | 1171/2 | 251/2 | 1085/8 | 1813/16 | 121/2 | |
240 or 480 | 200 | 5 | 125 | 251/2 | 1161/8 | 1813/16 | 121/2 | |
240 or 480 | 200 | 6 | 971/2 | 273/4 | 885/8 | 19 | 133/4 | |
240 or 480 | 225 | 6 | 1051/2 | 273/4 | 965/8 | 19 | 133/4 | |
240 or 480 | 250 | 6 | 1131/2 | 273/4 | 1045/8 | 19 | 133/4 | |
240 or 480 | 300 | 6 | 981/2 | 291/2 | 895/16 | 193/8 | 141/2 | |
240 or 480 | 325 | 6 | 1041/2 | 291/2 | 955/16 | 193/8 | 141/2 | |
240 or 480 | 350 | 6 | 1101/2 | 291/2 | 1011/16 | 193/8 | 141/2 |
These Dimensions are typical. Check factory for dimensions of a particular unit.
GENERAL
The high capacity
The 45, 72 or 108 steel sheathed tubular elements are centered in a 14”, 16” or 18” diameter steel heating chamber, respectively, and welded to a removable steel flange. The assembly is sur- rounded by 2” of insulation and a sheet metal jacket.
Depending upon the order specifications, the
temperatures and to limit internal temperatures under abnormal flow conditions. These controls do not
CAUTION: Users should install adequate
1.Vertical mounting (axis of chamber vertical) is preferred. Check factory for constructions suitable for hori- zontal mounting.
2.Mount heater with terminal enclo- sure at top, and use lower nozzle as inlet to the circulating fluid.
3.The
4.Mount heaters to permit unre- strained expansion of chamber due to temperature. The large flange lug
INSTALLATION
should be bolted solidly; however, the remaining lug should be bolted loosely to allow freedom of movement with expansion.
5. DANGER: Hazard of Fire. Provide minimum of 6” spac- ing from chamber and related piping to nearest combustible material. Avoid operation of heater near combustible fluids or in combustible vapor or gas laden atmosphere. Note: Contact factory for heaters suitable for use in hazardous locations.
6.Provide adequate space at terminal end to permit withdrawal of the heater from chamber should servicing be required.
7.If two or more heaters are needed to provide the needed heat- ing capacity, arrange them for series flow.
8.DANGER: Possible Explosion. A pressure relief valve
should be provided by customer at outlet of vessel. There should be no valving between vessel and relief valve.
Figure A
© 2010 Chromalox, Inc.