11 Install the switch
Beforeyou install the switch, review the Regulatory Compliance
and Safety Information document that came with your switch.
Formore information about installation, see the User Guide for
the Catalyst Express 500 Switches online at Cisco.com.
When selecting an installation site, observe these guidelines:
Cabling is away from sources of electrical noise, such as
radios, power lines, and fluorescent lighting fixtures.
Clearance to the switch front and rear panels is such that
Airflow around the switch and through the vents is
unrestricted.
Front-panel LEDs can be easily read.
Access to ports is sufficient for unrestricted cabling.
ACpower cord can reach from the AC power outlet to
the connector on the switch rear panel. The power
outletmust be accessible at all time because it serves as
the main method to disconnect power from the switch.
Temperature does not exceed 113˚F (45˚C), humidity does
notexceed 85 percent, and altitude at the installation site is
not greater than 10,000 feet (3049 m).

Rack-mounting

Position the mounting bracket and screw on the side of the
switch. Tighten the screw with a screwdriver. Repeat on the
opposite side.
2
1
1X
2X
POWER
OVER
ETHERNET
11X
12X
4
36
58
710
912
11 14
13
13X
14X
23X
24X
16
15 18
17 20
19 22
21 24
23
25
25
26
26
SYSTEM
ALERT
PoE
SETUP
RPS
Catalyst Express 500
SERIES